Mr. Himanshu H. Mehta, P.E. GeospteC D <br />19 December 2019 consultants <br />Page 2 <br />• Task 3 — Bid Specification Package <br />The remainder of this section presents a general description of the activities to be performed as part of <br />each task. <br />Task 1— Proiect Management <br />Under this task, Geosyntec will perform project planning and management responsibilities, such as <br />correspondence with IRC and Schmidt Nichols Landscape Architecture and Urban Planning (Schmidt <br />Nichols), invoice review, project coordination, and project administration. The budget includes four hours <br />for the project manager, one hour for the principal -in -charge, and six hours for an administrative assistant. <br />Task 2 — Finalize Conceptual Desitin <br />The redevelopment plan for the Former South Gifford Road Landfill is a conceptual design that was <br />finalized by Schmidt Nichols for discussion at the August 2019 pre -application meeting. Some of the <br />comments in the 27 August 2019 comment letter was associated with the finalized design along 41 st Street; <br />therefore, under this task we propose to enlist the assistance of the local landscape architect (Schmidt <br />Nichols) to address the comments and finalize the landscaping design along 41" Street. This effort is <br />specific to Phase 1 and is not intended to further address the redevelopment plan for the other phases at <br />this time. Under this task, Geosyntec will work with our subcontractor, Schmidt Nichols, to finalize the <br />conceptual design for the landscaping along 41" Street. The estimated budget for this task includes <br />finalizing the design (including irrigation design) and completion of sealed plans by a landscape architect. <br />Task 3 — Bid Specification Packagre <br />Under this task, a tree survey of the approximate 5 -acre area and environmental summary for the area that <br />needs to be cleared will be completed/prepared for inclusion in the bid specification package. Geosyntec <br />will work with a local tree surveyor to conduct the tree survey. Once the tree survey is completed, the <br />landscape architect will provide a plan for the identification of tree species that is needed to obtain a <br />clearing permit. Please note, that there are budget line items for the landscape architect in this task, as well <br />as Task 2, because a landscape architect needs to review and seal a tree survey. <br />The tree survey will take approximately 2 days to completed and Geosyntec has assumed (as a cost - <br />savings measure) that onsite assistance will be provided to the tree surveyor from IRC. Additionally, as <br />requested by IRC, as part of this amendment, Geosyntec will provide a summary of the previous <br />environmental assessment and remediation activities completed at the Site, including the identification of <br />existing wells, discussion on how soil and groundwater contamination will be addressed, and information <br />needed to develop an erosion control plan. This information will be provided as part of the originally <br />scoped bid specification. <br />XRl 8011_Change Order Gifford_F <br />engineers I scientists I innovators <br />