My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/05/2019 (2)
CBCC
>
Meetings
>
2010's
>
2019
>
11/05/2019 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2020 12:31:10 PM
Creation date
2/6/2020 12:26:41 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/05/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
[2E ENGINEERS <br />III. PROPOSED SCOPE OF CONSTRUCTION WORK <br />A. Remove existing roof systems down to the existing structural deck and provide new roof system <br />along with sheet metal flashing and accessories to provide a complete, watertight, warrantable <br />roof assembly. <br />IV. ESTIMATED CONSTRUCTION COSTS & ENGINEERING FEES <br />Based on the anticipated scope of work for this project, the opinion of probable construction costs and <br />proposed engineering fees are: <br />Engineerin Fees: <br />ees: <br />Contract Documents: <br />Contract Documents................................................................ $18,450.00 <br />Bidding....................................................................................... $1,250.00 <br />Construction Administration: <br />Construction Administration..................................................... $13,550.00 <br />Total Engineering Fee....................................................................... $33,250.00 <br />V. PROJECT SCHEDULE <br />A. Preliminary Contract Documents shall be completed within thirty (30) days of Notice to Proceed. <br />Final Contract Documents shall be completed and sealed within ten (10) days of receipt of <br />comments. <br />B. Construction Administration shall be performed during the estimated construction duration and <br />the project closeout process. This work is expected to take forty-five (45) days calendar days. <br />If this proposal meets with your approval, please notify us in writing. This proposal will remain firm for a period <br />of thirty (30) days. After that time, we reserve the right to review scheduled commitments and prices. <br />If you have any questions, please do not hesitate to call. <br />REI Engineers <br />Mark Renninger, PE, RRC <br />Branch Manager <br />Engineering solutions for tomorrow'" <br />10150 Highland Manor Drive, Suite 200 <br />Tampa, FL 33610 <br />PAGE 30F3 <br />reiet64eers.com <br />813.944.2137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.