Laserfiche WebLink
EXHIBIT "A" <br />WORK ORDER 8 <br />ROSELAND ROAD 6" FORCE MAIN EXTENSIONS & <br />WASTEWATER FACILITIES FOR DALE WIMBROW & DONALD MCDONALD PARKS <br />Masteller & Moler, Inc. is pleased to present you with Work Order 8 which provides Professional Engineering <br />Services for preparation of a Preliminary Engineering Study and Report, design and construction plans with <br />specifications, permitting, bidding, and construction administration / observation for the extension of the <br />existing force main system in Roseland Road, and wastewater collection and conveyance facilities to serve <br />Wimbrow and Donald McDonald Parks. We will use our innovative skills and experience to design the most <br />efficient system with the lowest construction, operational, and maintenance costs. Masteller and Moler Inc. will <br />provide for outside consulting services including surveying and soils engineering for the project. <br />PROJECT DESCRIPTION <br />The Indian River County Department of Utility Services and the County Parks and Recreation Department have <br />determined that a substantial environmental benefit to the St. Sebastian River will result from the construction <br />of wastewater facilities along Roseland Road and within the two (2) aforementioned parks. This project will <br />include a wastewater force main conveyance system along portions of Roseland Road between Rivers Edge and <br />the Kashi Village. The project will also involve the necessary wastewater collection and conveyance systems to <br />eliminate the existing septic systems serving the Dale Wimbrow and Donald McDonald parks. <br />The estimated construction costs for the utility improvements for Work Order 8, including both the Roseland <br />Road wastewater force main system and the collection and conveyance systems to service Dale Wimbrow and <br />Donald McDonald Parks, is at this time unknown and will be addressed as part of Task A as described below in <br />the Scope of Services. <br />In order that these wastewater facilities can be constructed and to accurately estimate their associated costs, <br />Masteller & Moler, Inc. proposes to perform the following Scope of Services: <br />SCOPE OF SERVICES <br />Task A — Preliminary Engineering Report <br />Masteller & Moler, Inc. will study the project areas and prepare a Preliminary Engineering Report (PER). The <br />PER will present alternatives and recommend the most cost benefit solution. A Conceptual Layout Plan of the <br />proposed force mains and a construction cost estimate will be prepared and included for the proposed 6" force <br />main extensions including valves, fittings, restoration, etc. <br />Another section of the PER will discuss the location and proposed facilities in order to eliminate the existing <br />septic tank systems located at Dale Wimbrow and Donald McDonald parks. The proposed collection and <br />conveyance system for the parks will not only consider the lowest construction cost but also environmental <br />concerns, including minimizing or eliminating impacts to the existing, densely -wooded conditions. A Conceptual <br />Sketch of the proposed collection and conveyance system layout to eliminate the existing septic systems will be <br />included in the Report. In addition, we will prepare and include a construction cost estimate of the proposed <br />wastewater improvements. <br />Exhibit A — Page 1 <br />