Laserfiche WebLink
The following information is requested from the Utilities and Parks & Recreation Departments: <br />1. As -Built Plans of the existing force main systems in Roseland Road. <br />2. Pressures in the Roseland Road force mains at Rivers Edge and Kashi Village. <br />3. As -Built Plans of the potable water pipeline in Roseland Road between Rivers Edge and Kashi Village. <br />4. Two (2) years -worth of flow data for Dale Wimbrow and Donald McDonald Parks. <br />5. Maximum (actual or estimated) daily number of people (per park) using Dale Wimbrow and Donald <br />McDonald Parks. <br />6. Details on dump station — the quantity and frequency the drain field is pumped out, etc. <br />Task B — Surveying Services <br />Masteller & Moler, Inc. will use the services of our survey sub -consultant Masteller, Moler & Taylor, Inc. to <br />provide a Route Survey for the Roseland Road force main extensions and a survey showing the location of the <br />existing septic systems in the Dale Wimbrow and Donald McDonald parks. The survey will show all visible <br />improvements and other information as needed for Engineer to design the project. Elevations will be taken <br />based on NAVD 1988 datum as required for the project design. <br />Task C — Desien & Construction Plan Services <br />Masteller & Moler, Inc. will provide design and engineering services in order to prepare Construction Plans and <br />Specifications suitable for the project's permitting and construction, showing and describing the proposed 6" <br />force main system, as well as the collection and conveyance system to serve and eliminate the septic systems in <br />Dale Wimbrow and Donald McDonald parks. Construction Plans and Specifications will be prepared for the force <br />main and collection & conveyance systems in the parks based on the assumption that the project will be bid as <br />one (1) project. We will also prepare an estimate of construction cost based on the bid ready Construction Plans. <br />Task D — Permitting Services <br />The above-described project will require the preparation of three (3) separate FDEP permit applications for <br />construction of the force main system and for construction of the collection and conveyance system in the two <br />(2) parks. In addition, a County Right-of-way permit will be required for construction of the Roseland Road force <br />main system. A City of Sebastian Right-of-way permit may be required for construction of a portion of the <br />Roseland Road force main system. Our services will include preparing applications to secure the FDEP permits <br />and the Indian River County Right-of-way permit, along with the necessary plans and supporting data. Our <br />services will also include coordination with the City of Sebastian (CoS) to determine if a Right-of-way permit is <br />required and preparation of the application to secure the CoS Right-of-way permit, if necessary. No other permit <br />applications are included. Permit application fees associated with the permits which we are securing are not <br />included in our fees. <br />Task E — Soils Engineering Services <br />Masteller & Moler, Inc. will use the services of our soils engineering sub -consultant KSM Engineering & Testing <br />to provide soils engineering services for the project along Roseland Road and within the parks. The soils <br />Exhibit A — Page 2 <br />