My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
10/22/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 10:19:01 AM
Creation date
2/12/2020 10:18:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/22/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-40 <br /> LOCAL AGENCY PROGRAM AGREEMENT PROGRAM MANAGEMENT <br /> OGC-12/18 <br /> Pagel of 1 <br /> EXHIBIT"A" <br /> PROJECT DESCRIPTION AND RESPONSIBILITIES <br /> FPN: 440019-1-58-01 <br /> This exhibit forms an integral part of the Local Agency Program Agreement between the State of Florida, Department of <br /> Transportation and <br /> Indian River County(the Recipient). <br /> PROJECT LOCATION: <br /> ❑ The project is on the National Highway System. <br /> ❑The project is on the State Highway System. <br /> PROJECT LENGTH AND MILE POST LIMITS:0.847 Miles-MP 1.220 to MP 2.067 <br /> PROJECT DESCRIPTION: Construction of a .85 mile long 8'wide sidewalk on the East side of 43ra Ave. between Airport <br /> Dr. West and 41s St. The work will also include minor shoulder, ditch grading, minor drainage piping with drainage <br /> structures. Signing and pavement markings. <br /> SPECIAL CONSIDERATIONS BY RECIPIENT: • <br /> The Recipient is required to provide a copy of the design plans for the Department's review and approval to coordinate <br /> permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br /> The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br /> accordance with the following schedule: <br /> a)Study to be completed by .N/A <br /> b) Design to be completed by .N/A <br /> c) Right-of-Way requirements identified and provided to the Department by N/A. <br /> d) Right-of-Way to be certified prior to advertising for construction (All Phase 58 LAPS) . <br /> e) Construction contract to be let by 2/6/2020. <br /> f) Construction to be completed by 12/31/2021. <br /> If this schedule cannot be met, the Recipient will notify the Department in writing with a revised schedule or the project is <br /> subject to the withdrawal of funding. <br /> SPECIAL CONSIDERATIONS BY DEPARTMENT: <br /> 97 <br />
The URL can be used to link to this page
Your browser does not support the video tag.