My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
10/22/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 10:19:01 AM
Creation date
2/12/2020 10:18:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/22/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525.01(3-408 <br /> LOCAL AGENCY PROGRAM AGREEMENT PROGRAMMANGEM,ENT <br /> OGC-10118 <br /> Page 1 of 1 <br /> EXHIBIT"B" <br /> SCHEDULE OF FINANCIAL ASSISTANCE <br /> RECIPIENT NAME&BILLING-ADDRESS: Indian River County FINANCIAL PROJECT NUMBER: 440019-1-58-01 <br /> 1801 27th St.Vero Beach, Fl.32960 <br /> MAXIMUM PARTICIPATION <br /> (1) <br /> TOTAL <br /> PHASE OF WORK By Fiscal Year PROJECT FUNDS LOCAL FUNDS STATE FUNDS FEDERAL FUNDS <br /> Design-Phase 38 <br /> FY: (Insert Program Name) $ $ $ $ <br /> FY: (Insert Program Name) $ $ $ $ <br /> FY: (Insert Program Name) $ $ $ $ <br /> Total Design Cost $ 0.00 $ 0.00 $ 0.00 $ 0.00 <br /> Right-of-Way-Phase 48 <br /> FY: (Insert Program Name) $ $ $ $ <br /> FY: (Insert Program Name) $ $ $ $ <br /> FY: (Insert Prooram Name) $ $ _ $ $ <br /> Total Right-of-Way Cost $ 0.00 $ 0.00 $ 0.00 $ 0.00 <br /> Construction-Phase 58 <br /> FY: (Insert Program Name) $ $ $ $ <br /> FY: 2020 (Insert Program Name) $432,783.00 $ $ $432.783.00 <br /> FY: 2020 (Insert Program Name) $54,393.00 $54,393.00 $ $ <br /> Total Construction Cost $487.176.00 $54,393.00 $ 0.00 $432,783.00 <br /> Construction Engineering and Inspection(CEI)-Phase 68 <br /> FY: (Insert Program Name) $ $ $ $ <br /> FY: (Insert Program Name) $ $ $ $ <br /> FY: (Insert Program Name) $ $ $ $ <br /> Total CEI Cost $ 0.00 $ 0.00 $ 0.00 $ 0.00 <br /> (Insert Phase), <br /> FY: (Insert Program Name) $ $ $ $ <br /> FY: (Insert Program Name) $ $ $ $ <br /> FY: (Insert Program Name) $ $ $ $ <br /> Total Phase Costs $ 0.00 $ 0.00 $ 0.00 $ 0.00 <br /> TOTAL COST OF THE PROJECT $487,176.00 $54,393.00 $ 0.00 $432,783.00 <br /> COST ANALYSIS CERTIFICATION AS REQUIRED BY SECTION 216.3475,FLORIDA STATUTES: <br /> I certify that the cost for each line item budget category has been evaluated and determined to be allowable,reasonable,and necessary as required by <br /> Section 216.3475,F.S.Documentation is on file evidencing the methodology used and the conclusions reached. <br /> Mya Williams <br /> District Grant Manager Name <br /> Signature Date <br /> 98 <br /> li <br />
The URL can be used to link to this page
Your browser does not support the video tag.