My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
10/22/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 10:19:01 AM
Creation date
2/12/2020 10:18:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/22/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT#1 <br /> Work Order Number 23 <br /> Bulk Caustic Tank Replacement <br /> At Hobart Water Treatment Plant <br /> PROJECT UNDERSTANDING <br /> The existing bulk caustic tank at the Hobart(North)Reverse Osmosis Water Treatment <br /> Plant(ROWTP) is more than 20 years old and recent inspection of the interior of the tank <br /> showed significant deterioration of the interior lining. The bulk tank is at the end of its <br /> service life, and therefore,replacement of the tank is necessary. Ancillary components to <br /> the bulk caustic storage tank, such as the tank heater, level transmitter, tank/piping <br /> insulation and heat tracing,piping, and containment coatings should also be addressed as <br /> part of the tank replacement. The scope of work consists of review and inspection of the <br /> existing tank conditions and site,preparation of design plans and specifications for a new <br /> tank and associated supply piping, coordination with FDEP, and bidding. <br /> SCOPE OF SERVICES <br /> Task 1: Review Existing Conditions <br /> Consultant will review existing caustic tank and piping at the Hobart ROWTP and <br /> evaluate options for a replacement tank. Consultant will develop a phasing plan to allow <br /> replacement of the existing tank without interrupting service. <br /> Task 2: Design Plans and Specification <br /> Consultant will prepare plans and specifications for a replacement tank. Plans will <br /> consist of a site plan,tank supports,piping,tie-in details, and general details. Photos may <br /> be used to depict details. It is anticipated that approximately four(4) drawings will be <br /> prepared. <br /> Specifications will be prepared and consist of the replacement tank, associated piping, <br /> coating of existing containment area, and demolition of existing tank. <br /> Consultant will provide 90%plans and specifications for review and comment as well as <br /> final plans and specifications for construction. The plans and specifications will be <br /> combined with the sulfuric acid tank replacement project(Work Order#14)to be bid out <br /> as a single construction contract. Drawings and specifications will be provided in <br /> electronic (.pdf—portable document format) form. <br /> 136 <br />
The URL can be used to link to this page
Your browser does not support the video tag.