My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/22/2019 (3)
CBCC
>
Meetings
>
2010's
>
2019
>
10/22/2019 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2020 10:19:01 AM
Creation date
2/12/2020 10:18:43 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/22/2019
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
215
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 3: Coordination <br /> Consultant will prepare permit application Form 62-555.900(1) and submit application <br /> with supporting plans and specifications to the Florida Department of Environmental <br /> Protection Southeast District. The permit application will include both the bulk sulfuric <br /> acid and caustic tank replacement. <br /> A permit application fee of$1,000.00, in accordance with FAC 62-4 n.7.a will be <br /> furnished by Indian River County Utilities as part of the application. <br /> Consultant will answer questions from contractors regarding the scope of work during the <br /> price proposal phase. Consultant will review one set of shop drawings on the tank and <br /> piping during the construction phase of the project. <br /> TIME SCHEDULE <br /> Services for Tasks 1 and 2 are anticipated to be completed within 5 weeks of notice to <br /> proceed. Task 3 will be concurrent with project construction and is anticipated to be <br /> completed within 6-8 months, depending on contractor's schedule. <br /> FEE SCHEDULE <br /> We will provide these services in accordance with our Continuing Consulting <br /> Engineering Services Agreement for Professional Services dated April 17t, 2018, by and <br /> between INDIAN RIVER COUNTY, a political subdivision of the State of Florida <br /> ("COUNTY") and Kimley-Horn and Associates, Inc., ("Consultant"). <br /> The Consultant will provide professional services for a lump sum fee as follows: <br /> Task No. Task Task Fee <br /> Task 1 Review Existing Conditions $ 3,300 <br /> Task 2 Design Plans and Specifications $ 13,200 <br /> Task 3 Coordination $ 5,500 <br /> TOTAL LUMP SUM FEE $22,000 <br /> ADDITIONAL SERVICES <br /> The following services are not included in the Scope of Services for this project,but may <br /> be required depending on circumstances that may arise during the execution of this <br /> project. Additional services include,but may not be limited to the following: <br /> • Construction phase services not described herein <br /> 137 <br />
The URL can be used to link to this page
Your browser does not support the video tag.