Laserfiche WebLink
CARTER ASSOCIATES INC. <br />JANUARY 2020 <br />FEE SCHEDULE <br />Staff Type: <br />Hourly Rates <br />Engineer (Principal) <br />$165.00 <br />Engineer I <br />$140.00 <br />Engineer II <br />$125.00 <br />Engineer III <br />$115.00 <br />Engineer IV <br />$105.00 <br />Engineer V <br />$ 95.00 <br />Surveyor (Principal) <br />$165.00 <br />Surveyor (Sr. Consultant) <br />$140.00 <br />Surveyor I <br />$140.00 <br />Surveyor ll <br />$125.00 <br />Surveyor III <br />$105.00 <br />CAD/GIS Tech I <br />$115.00 <br />CAD/GIS Tech It <br />$110.00 <br />CAD/GIS Tech III <br />$105.00 <br />CAD/GIS Tech IV <br />$ 95.00 <br />CAD/GIS Tech V <br />S 85.00 <br />Administrative Staff <br />$ 60.00 <br />Expert Witness <br />$300.00 <br />4 Man Survey Crew <br />$175.00 <br />3 -Man Survey Crew <br />$150.00 <br />2 -Man Survey Crew <br />$135.00 <br />1 -Man Survey Crew <br />$110.00 <br />Inspector <br />$ 65.00 <br />SPECIALIZED EQUIPMENT: <br />Leica HD P40 Scanner <br />$175.00/Hour <br />Aluminum Boat <br />$500.00/Day <br />All -Terrain Vehicle (ATV)/Trailer <br />$250.00/Day <br />$1,000.00/Week <br />REIMBURSABLE EXPENSES: <br />Postage, Express Mail, etc. <br />Cost <br />Blueprints/Blackline (24" x 36") <br />$2.00/Each <br />Color Prints (24"x36) <br />$5.00/Each <br />Mileage <br />IRS Standard Rate <br />Mylar <br />$7.00/Each <br />Photocopies: <br />8.5" x 11" <br />15¢/Each <br />8.5" x 14" <br />25¢/Each <br />11" x 17" <br />35¢/Each <br />Concrete Monuments <br />$20.00/Each <br />Rebar <br />$ 2.50/Each <br />Laths <br />$ 0.75/Each <br />Hubs <br />$ 1.00/Each <br />Sub -Consultants <br />Cost + 10% <br />Note: These hourly billing rates will remain effective for the duration of this Agreement <br />C:1Users%poweII\DesktoplCa rte r_WorkOrder3_2-11-20.doc <br />©2020 by CAI <br />Page 3 of 3 <br />