Laserfiche WebLink
Jones Pier Conservation Area <br />Manhour Breakdown <br />2/7/2020 <br />TASK <br />1) Administrative Tasks <br />1 Pre Construction Meeting <br />2 Weekly Progress Meetings (1 Weekly/ 6 Mo. Duration - 26 Meetings) <br />3 Review Contractor's Schedule Updates <br />4 Coordination with Outside Design Consultants <br />5 Respond to Contractor RFI's and provide Clarifications <br />6 Shop Drawing Review <br />7 Geotechnical Report Review <br />8 Consultation with IRC and Processing Change Order Requests as Necessary <br />9 Review Pay Requests and Submit to IRC once approved. <br />II) Site Inspections <br />10 Silt Fencing Inspection <br />11 MOT Plan Inspection During Jungle Trail Closing <br />12 Construction Oversight - Average of 3 site inspections / Week <br />13 Pump Material and linstallation Inspections. <br />14 Pump Electrical Controls Installations <br />15 Pipe Material and Installation Inspections <br />16 Water Connection and Pressure Test Observations <br />17 Sewer Connection and Testing Observations <br />III) Project Closeout <br />18 Conduct Final Inspections and Prepare Punch -List <br />19 Review of As -built Survey for Compliance with Plans <br />20 Review Phase 1 Final Certification to IRC <br />21 Review Phase 1 Final Certification to SJRWMD <br />HOURS <br />Principal Engineer I Inspector <br />2 2 <br />13 13 <br />16 <br />8 <br />2 8 <br />2 8 <br />4 <br />4 4 <br />12 <br />Total Hours 63 35 0 <br />Hourly Rate $165/HR $140/HR $65/HR <br />Total Cost $10,395 $4,900 $0 $15,295 <br />Principal Engineer I Inspector <br />4 <br />4 <br />156 <br />4 <br />4 <br />4 <br />1 2 <br />1 2 <br />Total Hours 0 14 168 <br />Hourly Rate $165/HR $140/HR $65/HR <br />Total Cost $0 $1,960 $10,920 $12,880 <br />Principal Engineer I Inspector <br />4 4 <br />2 2 <br />1 <br />1 <br />Total Hours 8 6 0 <br />Hourly Rate $165/HR $140/1-111 $65/HR <br />Total Cost $1,320 $840 $0 $2,160 <br />$30,335 <br />