My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-038
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:25:06 PM
Creation date
3/9/2020 12:42:42 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Grant
Approved Date
03/03/2020
Control Number
2020-038
Agenda Item Number
8.K.
Entity Name
Federal Emergency Management Agency (FEMA)
Subject
Subaward and Grant Agreement Z1630 for Hurricane Dorian damages
Project Number
Z1630
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />Y <br />t�Np 5 FEMA <br />prior to accepting a fixed -cost offer. Additionally, time extension denials on a Pilot Project <br />are not appealable. <br />K. AUDITS <br />The U.S. Department of Homeland Security's Office of Inspector General and the U.S. <br />Government Accountability Office have authority to audit any project. Once the Applicant <br />signs the fixed -cost offer, FEMA may still adjust funding due to audit findings. <br />L. PILOT POLICY VERSUS STANDARD PA POLICY <br />The following table summarizes the differences between the Alternative Procedures Pilot <br />policy and the standard PA policy: <br />Alternative Procedures Policy <br />Standard Policy <br />Fixed -cost project with use of excess funds. <br />Actual cost project. No retention <br />of excess funds associated with <br />the approved estimate. <br />May use funds across all Pilot projects. <br />Can only use funds toward the specific <br />work identified in each specific project. <br />After FEMA approves a SOW, approval is only <br />After FEMA approves a SOW, <br />required for changes that involve buildings or <br />approval is required for any change <br />structures aged 45 years or older, ground <br />to the SOW. <br />disturbing activities, or work in or near water. <br />Do not need to track costs associated with <br />Must track costs associated with all <br />changes to the SOW. <br />changes to the SOW. <br />Do not need to track costs to specific work items. <br />Must track costs specific to each <br />Only need to track the total costs associated with <br />work item within each individual <br />the Pilot Projects. <br />project. <br />Do not need to track work to specific Pilot <br />Must track all work to each <br />Projects. Only need to substantiate that the <br />individual project. <br />work is related to the approved SOW covered in <br />the Pilot Projects. <br />Page 7 of 8 <br />Keith Turi <br />Assistant Administrator, Recovery Directorate <br />August 29, 2019 <br />Date <br />45 <br />FEMA Recovery Policy FP 104-009-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.