Laserfiche WebLink
Kimley*Horn <br />PROJECT: 58TH AVENUE WIDENING (47th Street to 1/4 mile north of 49th Street) <br />CLIENT: Indian River County <br />Friday, October 25, 2019 <br />OPINION OF PROBABLE CONSTRUCTION COSTS - SCALE Report <br />Roadway and Drainage <br />"The Engineer has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractors methods of <br />determining prices, or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to <br />the Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer <br />cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinion of probable costs." <br />PAY <br />ITEM NO. <br />DESCRIPTION <br />UNIT <br />PROJECT <br />QUANTITY <br />UNIT <br />COST <br />PROJECT <br />COST <br />ROADWAY PAY ITEMS <br />101-1A <br />MOBILIZATION/ DEMOBILIZATION <br />'LS <br />1 <br />$50,000 <br />$50.000 <br />102-1A <br />MAINTENANCE OF TRAFFIC <br />LS <br />1 <br />$10,000 <br />$10,000 <br />104-2A <br />PREVENTION, CONTROL & ABATEMENT OF EROSION AND WATER POLLUTION <br />LS <br />1 <br />$35,000 <br />635.000 <br />108-1A <br />CONSTRUCTION LAYOUT/ RECORD DRAWINGSLS <br />1 <br />$12,500 <br />$12,500 <br />110-1-1A <br />CLEARING&GRUBBING <br />AC <br />6.6 <br />$12,500 <br />$82,500 <br />120-1A <br />REGULAR EXCAVATION <br />CY <br />3250 <br />$6.00 <br />$19.500 <br />120-4A <br />SUBSOIL EXCAVATION <br />CY <br />175 <br />$12.00 <br />$2,100 <br />120-6A <br />EMBANKMENT <br />CY <br />2,975 <br />$8.00 <br />523,800 <br />160-4A <br />TYPE '13' STABILIZATION <br />SY <br />15,550 <br />64.50 <br />569,975 <br />285-701A <br />CEMENTED COQUINA (LBR 100) (4') <br />SY <br />10.0 <br />$12.00 <br />$120 <br />285-704A <br />CEMENTED COQUINA (LBR 100) (6') <br />SY <br />1,095 <br />$15.00 <br />516,425 <br />285-709A <br />CEMENTED COQUINA (LBR 100) (10') <br />SY <br />12,915 <br />$18.00 <br />$232,470 <br />334-1-13A <br />SUPERPAVE ASPHALT CONCRETE (SP -12.5) (TRAFFIC C) (1.75") <br />TN <br />1.460 <br />$105 <br />$153,300 <br />337-7-82A <br />ASPHALTIC CONCRETE FRICTION COURSE (FC -9.5) (TRAFFIC C) (1.251 <br />TN <br />1,150 <br />$120 <br />6138.000 <br />400.1-2 <br />CLASS I CONCRETE (ENDWALL) <br />CY <br />2.3 <br />$1.300 <br />$2,990 <br />425-1-351A <br />INLET(CURB)(TYPE P-5)(< 10') <br />EA <br />3 <br />$5,300 <br />$15,900 <br />425-1-361A <br />INLET (CURB) (TYPE P-6) (< 10') <br />EA <br />4 <br />$5,500 <br />522,000 <br />425-1-451A <br />INLET (CURB) (TYPE J-5) (< 10') <br />EA <br />2 <br />$8,000 <br />$16,000 <br />452-1-461A <br />INLET (CURB) (TYPE J-6)(< 10') <br />EA <br />2 <br />58,800 <br />$17,600 <br />425-1-521A <br />INLET (DBI) (TYPE C) (<10') <br />EA <br />1 <br />$4,100 <br />$4,100 <br />425-1-529A <br />INLET(DBI)(TYPEC)(WITH SLOTS) <br />EA <br />1 <br />$4.100 <br />$4,100 <br />425-1-541A <br />INLET (DBI) (TYPED) (< 10') <br />EA <br />2 <br />$4.800 <br />59,600 <br />4252-72A <br />MANHOLE (J-7)(> 10') <br />EA <br />1 <br />68200 <br />$8200 <br />425-5A . <br />MANHOLE (ADJUST) <br />EA <br />1 <br />6900 <br />$900 <br />425-6A <br />VALVE BOX (ADJUST) <br />EA <br />7 <br />6600 <br />$4200 <br />425-11A <br />MODIFY EXISTING DRAINAGE STRUCTURE <br />EA <br />2 <br />$2,500 <br />$5,000 <br />430-175-115A <br />CONCRETE PIPE CULVERT (15') (CL III) <br />LF <br />30 <br />$45.00 <br />$1,350 <br />430-175-118A <br />CONCRETE PIPE CULVERT (18') (S/CD) (CL III) <br />LF <br />300 <br />$55.00 <br />516,500 <br />430-175-124A <br />CONCRETE PIPE CULVERT (241 (S/CD) (CL 111) <br />LF <br />300 <br />$65.00 <br />519,500 <br />430.175-124AA <br />CAP PIPE CULVERT (24') (S/CD) _ <br />LF <br />25 <br />$55.00 <br />$1,375 <br />430-175-130A <br />CONCRETE PIPE CULVERT(301 (S/CD) (CL III) <br />LF <br />300 <br />$75.00 <br />$22,500 <br />430-175-136A <br />CONCRETE PIPE CULVERT (36') (S/CD) (CL III) <br />LF <br />350 <br />$85.00 <br />$29,750 <br />430-175-142A <br />CONCRETE PIPE CULVERT (42") (S/CD) (CL III) <br />LF <br />400 <br />$105 <br />$42,000 <br />430-175-166A <br />CONCRETE PIPE CULVERT (66') (S/CD) (CL III) <br />LF <br />70 <br />$380 <br />• 626,600 <br />430-175-218A <br />CONCRETE PIPE CULVERT (14"X23") (S/CD) (CL III) <br />LF <br />25 <br />$55.00 <br />$1,375 <br />430-175-236A <br />CONCRETE PIPE CULVERT (29'X45') (S/CD) (CL III) <br />LF <br />60 <br />$170.00 <br />610200 <br />430-982-123A <br />MITERED END SECTION (15") <br />EA <br />1 <br />51,500 <br />51,500 <br />430-982-129A <br />MITERED END SECTION (24") <br />EA1 <br />$1,750 <br />$1,750 <br />430-984.625A <br />MITERED END SECTION (14'X23') <br />EA <br />2 <br />$1,500 <br />$3,000 <br />515-2.311A <br />PEDESTRIAN / BICYCLE RAILING (ALUMINUM) (42" PICKET RAIL) <br />LF <br />11 <br />$75.00 <br />$825 <br />520-1-10A <br />CONCRETE CURB & GUTTER, TYPE F <br />LF <br />, 3,850 <br />$16.00 <br />561,600 <br />520-5-46A <br />TRAFFIC SEPARATOR CONCRETE - TYPE IV MOD., 8' WIDE (OPT1ON 1) <br />LF <br />710 <br />$40.00 <br />$28,400 <br />522-2A <br />CONCRETE SIDEWALK AND DRIVEWAYS (6' THICK) <br />SY <br />1,550 <br />$45.00 <br />569.750 <br />ROADWAY PAY ITEMS <br />527-2A <br />DETECTABLE WARNINGS <br />SF <br />40 <br />$40.00 <br />$1,600 <br />570-1-2A <br />PERFORMANCE TURF (SOD) (BAHIA) <br />SY <br />14,000 <br />52.75 <br />638,500 <br />630-2-11AA <br />CONDUIT (OPEN TRENCH) (F&I)(2"PVC) <br />LF <br />1,175 <br />57.50 <br />$8,813 <br />633-1-123AA <br />FIBER OPTIC CABLE (F&I) (UNDERGROUND) (96 PAIR) <br />LF <br />1275 <br />66.50 <br />$8288 <br />633-2-31A <br />FIBER OPTIC CONNECTION (INSTALL) (SPLICE) <br />EA <br />33 <br />6100 <br />$3,300 <br />180 <br />