Kimley»>Horn
<br />PROJECT: 58TH AVENUE WIDENING (47th Street to 1/4 mile north of 49th Street)
<br />CLIENT: Indian River County
<br />Friday, October 25, 2019
<br />OPINION OF PROBABLE CONSTRUCTION COSTS - SCALE Report
<br />Roadway and Drainage
<br />"The Engineer has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractor's methods of
<br />determining prices, or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to
<br />the Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer
<br />cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinion of probable costs."
<br />PAY
<br />ITEM NO.
<br />DESCRIPTION
<br />UNIT
<br />PROJECT
<br />QUANTITY
<br />UNIT
<br />COST
<br />PROJECT
<br />COST
<br />633-2-32A
<br />FIBER OPTIC CONNECTION (INSTALL) (TERMINATION)
<br />EA
<br />33
<br />$85.00
<br />$2,805
<br />633-3.11 AA
<br />FIBER OPTIC CONNECTION HDWR(SPLICE ENCLOSURE)
<br />EA
<br />1
<br />$803
<br />$803
<br />635-2-11A
<br />PULL AND SPLICE BOX (F&I) (17"X30") (PULL BOX)
<br />EA
<br />2
<br />$1,200
<br />$2,400
<br />635-2-12A
<br />PULL AND SPLICE BOX (F&I) (30"X48") (SLACK BOX)
<br />EA
<br />1
<br />$1,750
<br />$1,750
<br />$348
<br />ROADWAY SUB -TOTAL =
<br />$1,362,513
<br />SIGNING AND MARKING PAY ITEMS
<br />700.1.11A
<br />SINGLE POST SIGN (F & 1) ( < 12 SF)
<br />AS
<br />11
<br />$350
<br />53,850
<br />700-1-50A
<br />SINGLE POST SIGN (RELOCATION)
<br />AS
<br />2
<br />$270
<br />5540
<br />700-2-12A
<br />MULTI - POST SIGN (F & I) (12 - 20 SF)
<br />AS
<br />1
<br />$3,350
<br />$3,350
<br />706-3A
<br />RETRO -REFLECTIVE MARKERS
<br />EA
<br />240
<br />$5.00
<br />$1,200
<br />710.11-290A
<br />PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, ISLAND NOSE
<br />SF
<br />116
<br />53.00
<br />$348
<br />711-11-121A
<br />THERMOPLASTIC, STD, WHITE, SOLID, 6"
<br />LF
<br />5,015
<br />$1.50
<br />$7,523
<br />711-11-123A
<br />THERMOPLASTIC, STD, WHITE, SOLID, 12"
<br />LF
<br />416
<br />$3.00
<br />$1,248
<br />711-11-125A
<br />THERMOPLASTIC, STD, WHITE, SOLID, 24"
<br />LF
<br />95
<br />$5.00
<br />$475
<br />711-11-131A
<br />THERMOPLASTIC, STD,WHITE, SKIP (10'-30'), 6" -
<br />LF
<br />1,750
<br />$1.50
<br />$2,625
<br />711.11.141A
<br />THERMOPLASTIC, STD,WHITE, SKIP (2'-4' / 6'-10'), 6"
<br />LF
<br />500
<br />$1.50
<br />$750
<br />711-11-160A
<br />THERMOPLASTIC, STD, WHITE, MESSAGE
<br />EA
<br />5
<br />$190
<br />$950
<br />711-11-170A
<br />THERMOPLASTIC, STD, WHITE, ARROW
<br />EA
<br />12
<br />$75.00
<br />$900
<br />711-11-221A
<br />THERMOPLASTIC, STD, YELLOW, SOLID, 6"
<br />LF
<br />5,100
<br />$1.50
<br />57,650
<br />711-11-224A
<br />THERMOPLASTIC, STD, YELLOW, SOLID, 18'
<br />LF
<br />300
<br />$4.00
<br />$1,200
<br />711-11-241A
<br />THERMOPLASTIC, STD, YELLOW, SKIP, (2'-4' / 6'-10'), 6"
<br />LF
<br />356
<br />$1.50
<br />$534
<br />SIGNING AND PAVEMENT MARKING SUB -TOTAL =
<br />633,143
<br />TOTAL
<br />$1,395,656
<br />181
<br />
|