Laserfiche WebLink
Kimley»>Horn <br />PROJECT: 58TH AVENUE WIDENING (47th Street to 1/4 mile north of 49th Street) <br />CLIENT: Indian River County <br />Friday, October 25, 2019 <br />OPINION OF PROBABLE CONSTRUCTION COSTS - SCALE Report <br />Roadway and Drainage <br />"The Engineer has no control over the cost of labor, materials, equipment or services furnished by others, or over the Contractor's methods of <br />determining prices, or over competitive bidding or market conditions. Opinions of probable costs provided herein are based on the information known to <br />the Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry. The Engineer <br />cannot and does not guarantee that proposals, bids, or actual construction costs will not vary from its opinion of probable costs." <br />PAY <br />ITEM NO. <br />DESCRIPTION <br />UNIT <br />PROJECT <br />QUANTITY <br />UNIT <br />COST <br />PROJECT <br />COST <br />633-2-32A <br />FIBER OPTIC CONNECTION (INSTALL) (TERMINATION) <br />EA <br />33 <br />$85.00 <br />$2,805 <br />633-3.11 AA <br />FIBER OPTIC CONNECTION HDWR(SPLICE ENCLOSURE) <br />EA <br />1 <br />$803 <br />$803 <br />635-2-11A <br />PULL AND SPLICE BOX (F&I) (17"X30") (PULL BOX) <br />EA <br />2 <br />$1,200 <br />$2,400 <br />635-2-12A <br />PULL AND SPLICE BOX (F&I) (30"X48") (SLACK BOX) <br />EA <br />1 <br />$1,750 <br />$1,750 <br />$348 <br />ROADWAY SUB -TOTAL = <br />$1,362,513 <br />SIGNING AND MARKING PAY ITEMS <br />700.1.11A <br />SINGLE POST SIGN (F & 1) ( < 12 SF) <br />AS <br />11 <br />$350 <br />53,850 <br />700-1-50A <br />SINGLE POST SIGN (RELOCATION) <br />AS <br />2 <br />$270 <br />5540 <br />700-2-12A <br />MULTI - POST SIGN (F & I) (12 - 20 SF) <br />AS <br />1 <br />$3,350 <br />$3,350 <br />706-3A <br />RETRO -REFLECTIVE MARKERS <br />EA <br />240 <br />$5.00 <br />$1,200 <br />710.11-290A <br />PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, ISLAND NOSE <br />SF <br />116 <br />53.00 <br />$348 <br />711-11-121A <br />THERMOPLASTIC, STD, WHITE, SOLID, 6" <br />LF <br />5,015 <br />$1.50 <br />$7,523 <br />711-11-123A <br />THERMOPLASTIC, STD, WHITE, SOLID, 12" <br />LF <br />416 <br />$3.00 <br />$1,248 <br />711-11-125A <br />THERMOPLASTIC, STD, WHITE, SOLID, 24" <br />LF <br />95 <br />$5.00 <br />$475 <br />711-11-131A <br />THERMOPLASTIC, STD,WHITE, SKIP (10'-30'), 6" - <br />LF <br />1,750 <br />$1.50 <br />$2,625 <br />711.11.141A <br />THERMOPLASTIC, STD,WHITE, SKIP (2'-4' / 6'-10'), 6" <br />LF <br />500 <br />$1.50 <br />$750 <br />711-11-160A <br />THERMOPLASTIC, STD, WHITE, MESSAGE <br />EA <br />5 <br />$190 <br />$950 <br />711-11-170A <br />THERMOPLASTIC, STD, WHITE, ARROW <br />EA <br />12 <br />$75.00 <br />$900 <br />711-11-221A <br />THERMOPLASTIC, STD, YELLOW, SOLID, 6" <br />LF <br />5,100 <br />$1.50 <br />57,650 <br />711-11-224A <br />THERMOPLASTIC, STD, YELLOW, SOLID, 18' <br />LF <br />300 <br />$4.00 <br />$1,200 <br />711-11-241A <br />THERMOPLASTIC, STD, YELLOW, SKIP, (2'-4' / 6'-10'), 6" <br />LF <br />356 <br />$1.50 <br />$534 <br />SIGNING AND PAVEMENT MARKING SUB -TOTAL = <br />633,143 <br />TOTAL <br />$1,395,656 <br />181 <br />