Laserfiche WebLink
Simulations 4 and 5 will be used by the CONSULTANT and OWNER in determining the groundwater level <br />drawdown due to the total proposed IRCU EOP withdrawal (23.18 mgd) occurring from each wellfield. <br />Since the relationship between pumping rate and groundwater level drawdown is linear in confined <br />aquifers, the maximum pumping rate can be determined for each wellfield that will not impact other <br />existing legal users of the UFA. Simulation 6 will be used as the baseline condition for determining <br />cumulative drawdown. The deliverable for this task will be maps showing the cone of depression <br />(groundwater level drawdown) for each wellfield pumping scenario and contours of cumulative <br />groundwater level drawdown due to pumping. The results of these Simulations 4 and 5 are for internal <br />purposes only and will not be submitted to SJRWMD in the groundwater modeling and impact <br />evaluation TM and/or described in the revised groundwater modeling plan. The results of Simulation 6 <br />will be submitted to SJRWMD in the groundwater modeling and impact evaluation TM and described in <br />the revised groundwater modeling plan. <br />TASK 2 - PREPARATION OF REVISED GROUNDWATER MODELING PLAN <br />The CONSULTANT will modify/update the existing groundwater modeling plan developed and approved <br />by SJRWMD in 2016 to describe the three simulations listed in WO No. 5 and the methodology and data <br />to adjust the agricultural pumping from legal users in the model domain. <br />The draft modeling plan will be submitted to the OWNER for review and comment. The CONSULTANT <br />will incorporate comments provided by the OWNER into the plan and send the final plan to SJRWMD for <br />review and approval before starting the model simulations. <br />TASK 3 - PROJECT AND QUALITY MANAGEMENT <br />Activities performed under this task consist of those general functions required to maintain the project <br />on schedule, within budget, and that the quality of the work products defined within this Work Order is <br />consistent with CONSULTANT's standards and the OWNER's requirements. Specific activities included <br />are identified below: <br />Subtask 3.1 - Project Quality Management <br />CONSULTANT maintains a Quality Management System (QMS) on all projects. In accordance with the <br />QMS, a project planning and scope review meeting will be conducted at the start of the project. In <br />addition, the CONSULTANT's Technical Specialists will perform quality reviews of the deliverables <br />identified in Task 1. <br />Subtask 3.2 - Project Status Reports <br />CONSULTANT's project manager will prepare and submit monthly written status reports with each <br />invoice for an anticipated project duration of 4 months. <br />OTHER SERVICES NOT INCLUDED IN THIS WORK ORDER <br />This Work Order does not include the following items: <br />• Preparation of a Consumptive Use Permit application or permit fee; or <br />• Modeling changes for SJRWMD Requests for Additional Information. <br />OWNER's RESPONSIBILITIES <br />The OWNER will provide all available data requested by the CONSULTANT for the purpose of completing <br />the aforementioned tasks. The data necessary for this project are, but not limited to the following: <br />CDM <br />Smith Page 3 of 4 jj2688_Exhibit A.docn <br />