2020-045
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:26:56 PM
Creation date
3/17/2020 12:57:29 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/10/2020
Control Number
2020-045
Agenda Item Number
8.M.
Entity Name
CDM Smith Inc.
Subject
Groundwater Modeling and Impact Evaluation
Support of Modification of Water Use Permit Number 10524
Amendment 1, Work Order 5
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To identify four new production well locations at the North Hobart Park Wellfield and six new <br />production well locations at the South Wellfield to be capable of producing 23.18 mgd from <br />each wellfield. <br />• To provide monthly water use data for the individual existing IRCUD production wells for the <br />past five years (2015-2019) in electronic format. <br />The OWNER will also provide a timely review of all work products. <br />SCHEDULE <br />Previously, it was anticipated that the Project will take a total of 3 months to complete, starting within <br />two weeks of receipt of a formal notice to proceed (NTP) on December 6, 2019. The groundwater <br />modeling report with impact evaluations was estimated to be completed within 90 days of Notice -to - <br />Proceed NTP was delayed until a project kickoff meeting could be scheduled in early January 2020. The <br />project Kickoff meeting was held on January 8, 2020 where the scope items in this amendment were <br />identified by the OWNER. This scope of work extends the schedule by 30 days for a total of 120 days <br />from January 8th, which corresponds to May 7, 2020. CONSULTANT will prepare an updated detailed <br />schedule within the first 10 calendar days after Notice -to -Proceed of Amendment 1. <br />COMPENSATION AND PAYMENT <br />Compensation for the work described in this Amendment shall be made on the basis of a lump sum fee. <br />The lump sum fee for Tasks 1, 2 and 3, inclusive, is $23,290 as shown in Exhibits B-1 and B-2. The <br />amended Work Order No. 5 lump sum amount is $88,090. CONSULTANT will invoice OWNER on a <br />monthly basis based on percent complete. For invoice purposes only, the value of each task is as shown <br />in the Table 1. <br />Table 1 Estimated Budget for Amendment 1 to Work Order No. 5 <br />TASK VALUE FOR INVOICE PURPOSES <br />TASK DESCRIPTION <br />VALUE <br />1 Additional Groundwater Modeling Simulations <br />$18,290 <br />2 Preparation of Revised Groundwater Modeling Plan <br />$3,170 <br />3 Project and Quality Management <br />$1,830 <br />TOTAL WORK ORDER NO. 5 AMMENDMENT 1- LUMP SUM <br />$23,290 <br />CDM <br />Smith Page 4 of 4 jj2688_Exhibit A.docx <br />