Laserfiche WebLink
Exhibit A <br />minor modifications to the design. The 100% plans will depict all aspects of the project <br />as detailed in the scope of services, and will include project specifications and notes for <br />construction. The ENGINEER will finalize the construction phasing plan and prepare <br />engineer's opinion of probable costs for construction for each phase. <br />TASK 6 — PROGRESS AND STAKEHOLDER MEETINGS <br />Attend meetings with County staff to review plans and progress at 30%, 60%, 90%, and 100% <br />design stages. Attend and participate at stakeholder and other public meetings. <br />TASK 7 — REIMBURSABLE EXPENSES <br />Reimbursable expenses, such as boat transportation, mileage, prints, copies, vellum, postage, etc. <br />SECTION 3: ENGINEERING SCOPE ASSUMPTIONS: <br />In developing this Scope of Services, ENGINEER represents to the CLIENT that the following <br />assumptions have been made and that deviation from these assumptions may require additional <br />work and compensation on behalf of CLIENT to the ENGINEER. <br />1. This proposal specifically excludes all application and/or impact fees, which shall be the <br />responsibility of CLIENT. <br />2. This Scope of Services specifically excludes preparation of legal documents, easement <br />descriptions, structural, mechanical, electrical, landscape, and architectural work. <br />3. Wetland planting design drawings, plant lists, and installation will be provided by others. <br />4. Civil engineering design and permitting fees for off-site improvements, such as deep -water <br />access or utility line extensions, are not included with this proposal. <br />5. Permitting for disposal of any existing on-site hazardous or industrial waste material, or any <br />other underground, unforeseen issues is not included with this proposal. <br />6. Construction services including but not limited to the preparation of construction contract <br />documents, contractor bidding, inspection services, as -built surveys and final certifications <br />are not included with this proposal, but can be provided as an additional service if needed. <br />7. Soil testing is not included in this proposal and would be considered as an additional service, <br />if required for ecological enhancement design. <br />8. Construction stakeout and as-builts are not included with this proposal. <br />C:\Users\sandywlAppData\LocaRMicrosof \Windows\Temporary Internet Files\Content.OutookU132PHUR\2020_02_CarterProposal_Lost Tree Island RFQ <br />2020008.doc Page 6 of 8 <br />©2020 by CAI <br />