My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-049
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 11:17:46 AM
Creation date
3/20/2020 3:52:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/17/2020
Control Number
2020-049
Agenda Item Number
8.D.
Entity Name
Kimley-Horn and Associates, Inc.
Revise the Drainage design within the draiage basin 66B
Subject
Amendment No. 7
Area
66th Avenue/County Road 510 Roadway Widening
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />66th Avenue/ County Road 510 Roadway Widening <br />Project Number: IRC -1505 & IRC -1505B <br />AMENDMENT NO. 7 TO THE PROFESSIONAL ENGINEERING/LAND SURVEYING SERVICES <br />AGREEMENT BETWEEN KIMLEY-HORN AND ASSOCIATES, INC. AND INDIAN RIVER COUNTY, FLORIDA. <br />This is an amendment to the existing Engineering/Land Surveying Services Agreement <br />(AGREEMENT) dated February 22nd, 2005 between Kimley-Horn and Associates, Inc. (ENGINEER) and <br />Indian River County (COUNTY). This amendment addresses changes in "Section III - Scope of <br />Services", "Section V - Compensation" and "Section XVI -Duration of Agreement" of the <br />AGREEMENT. <br />Amendment Description <br />"SECTION III -SCOPE OF SERVICES" is being modified to incorporate the following: <br />66th Avenue Phase IB — Drainage Basin 66B <br />The COUNTY desires to revise the proposed drainage design within drainage basin 66B (66th Avenue between <br />61St Street and 65th Street) from a single centralized 2.48 -acre wet detention drainage facility to two (2) wet <br />detention ponds (1.50 -acre and 1.61 -acre). <br />The ENGINEER will collect topographic design survey data and geotechnical soil data to support the <br />proposed drainage improvements. The drainage design modification will require the following <br />construction documents to be revised: <br />66th Avenue: <br />Plan & Profile Sheets — 5 sheets <br />Cross Section Sections —13 sheets <br />Erosion Control Sheets — 4 sheets <br />61St Street: <br />Plan & Profile Sheets — 3 sheets <br />Cross Section Sections — 8 Sheets <br />Erosion Control Sheets — 2 sheets <br />65th Street: <br />Plan & Profile Sheets — 2 sheets <br />Cross Section Sections — 5 sheets <br />Erosion Control Sheets — 4 sheets <br />Pond 66B Construction Details — 6 Sheets <br />In addition, the ENGINEER will revise all summary of pay item sheets, summary of quantity sheets, <br />drainage maps, etc. to fully integrate the above described revisions into the 100% Construction Plan <br />set. <br />Jurisdictional Permitting Revisions: <br />The ENGINEER shall prepare permit modification applications to St Johns River Water Management <br />
The URL can be used to link to this page
Your browser does not support the video tag.