My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-049
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 11:17:46 AM
Creation date
3/20/2020 3:52:23 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
03/17/2020
Control Number
2020-049
Agenda Item Number
8.D.
Entity Name
Kimley-Horn and Associates, Inc.
Revise the Drainage design within the draiage basin 66B
Subject
Amendment No. 7
Area
66th Avenue/County Road 510 Roadway Widening
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County, Amendment No. 7 <br />66th Avenue/ County Road 510 <br />Roadway Widening <br />District (SJRWMD) and Indian River Farms Water Control District (IRFWCD) for submittal by the County. <br />This will consist of all required evaluation, design, coordination, and follow-up work necessary to support <br />permit applications. The County will review the permit applications as necessary. The ENGINEER shall <br />assemble and be responsible for the final submittal. The County will be responsible for all permit <br />application fees. <br />66th Avenue Phase II — 66th Avenue south of CR 510 Roadway Re -alignment <br />The County desires to revise the 66th Avenue roadway alignment to coordinate with a proposed roundabout <br />at the 66th Avenue/CR 510 intersection which is being designed by the Florida Department of Transportation. <br />In addition, the roadway re -alignment will avoid impacting several existing electrical transmission poles. The <br />cost of relocating a single transmission pole is approximately $150,000. The reduction of transmission pole <br />impacts has the potential to reduce roadway construction costs by approximately $600,000. <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />
The URL can be used to link to this page
Your browser does not support the video tag.