My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-047A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-047A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:28:56 PM
Creation date
4/7/2020 12:41:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/17/2020
Control Number
2020-047A
Agenda Item Number
8.B.
Entity Name
GRBK GHO High Pointe, LLC
Subject
Utility Improvements on Florida East Coast Railway Property
Agreement to Warranty and Guranty Utility Improvements at Completion and to provide a
Bill of Sale
Area
65th Street/Old Dixie Hwy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. Joints; Rubber and steel joint for prestressed <br />• pipe in accordance with -Ont. Lock Joint Pipe <br />colpany:Specificat on an. SPS j or .equivalent. <br />Joints for bell and spigot and tongue and ,groove <br />pipe to be in accordance with current standard <br />practico, Joints may be made us ng confined <br />continuous rubber gasket. <br />2. east Iron Pipe <br />a: Materials;: Pipe :must cssnform to currerit ASTM <br />Specification A142 for "Standard Pipe." <br />b. Joints; Bell and spigot, caulked with lead and <br />oakum-, or and.app=oved. mechanical type. <br />3. Polyethylene Pipe <br />a. Materials: Pipe must conform to currant ASTM <br />Specifications vzio4, Schedule 40„, for standard <br />pipe. <br />4. steel Pipe <br />A. Materials,. Pipe must conform to current ASTM <br />Specification Al2'6, Scheduie 40,,. <br />b. Joints; All _joints must be welded or of an <br />approved mecFtanidal type.. <br />P. Carrier pipe with and ihtital .pressure less that 30 psi <br />Shall have the ends of the casing pipe sealed after <br />installation. <br />G. Carrier pipe with and ivit-a .tel pressurQ air.30 si and o <br />have, the .ca <br />casing pips shall be sealed <br />vent ,d either and <br />which 0*11 discharge 'into <br />p ver <br />)pew at the ends .itAMC- <br />ok leaks to discharge into <br />If 'this is not praaticable, the <br />at 'both ends. acid 4 inch relief <br />off the Railwayft right of way► <br />lzaanage 'ditch. or sewer. <br />er 10M. <br />IWIUdind bell ends of arises <br />H. Uncased high pressure -gas pipe. line crossings Will be <br />Permitted provided'.they cOMW vtt4 the requiremepts: of <br />Chapter One, Pali 5:.�, Specifications 'for gncased Gas <br />Fipa Lire within t : ;Railway Rigght of Nay as, is <br />containe8 in the "Maii�ial foz Railway Engineexs", asued by <br />the -American Raijvgy Rngineess kacaoc anon".. Zn the event of <br />C <br />on <br />Subi]. ct 4 -"Prov ,sivni of the "Oishoral 'Specifications for <br />gra<le ani Above Ottde Crossfngs ox Railwa'yfs Right of <br />Way” shal3 supersede. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.