My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-047A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-047A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2022 3:28:56 PM
Creation date
4/7/2020 12:41:57 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/17/2020
Control Number
2020-047A
Agenda Item Number
8.B.
Entity Name
GRBK GHO High Pointe, LLC
Subject
Utility Improvements on Florida East Coast Railway Property
Agreement to Warranty and Guranty Utility Improvements at Completion and to provide a
Bill of Sale
Area
65th Street/Old Dixie Hwy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. <br />All casing pipe installations where the diameter is <br />greater than 4:8 inches will require a preconstruction <br />conference at the project site. <br />7. <br />PreacnatriOction arrangements will be made with the <br />offUd, -Chief Engineer at least one week prior to <br />construction. A Railway inspector must be present <br />during the entire construction of the casing pipe. - <br />The- inspector will 'have complete authority <br />hority 6ver the <br />project on the Railway's right of way. <br />8. <br />All costs to provide inspection will be borne by the <br />lessee. <br />D. Tunnel liner eaquitement s are as follows: <br />I <br />All, appli; I Mble. preceding sections will govern tunnel <br />liner usage proposals_ <br />2. <br />Tunnel linerVlaitok will be 12 Pi, galvanized, and all <br />bolts and nuts will be galvanized. <br />3. <br />Live load will be based on X-80.Railway Loading using <br />ga pliicabtld formulae and computations performed by a <br />g stered. <br />e� professionalengineer. The computation <br />results Will accompany the plans for review by' the <br />dffice; of the Chief Engineer. <br />4. <br />Gtout holes will be provided at 10 foot intervals along <br />the roof and Sides.. <br />5. <br />The tunnel liner Jacking shield will protect 180 degrees <br />of the upper section and material removed to allow' for <br />minimum ,4444i 1';:I- Slope witha minimum 2.0 feet of <br />undisturbed soil supporting the overburden. <br />6. <br />The tunnel line installation will progress with <br />sufficient manpower and supervision f ir around the <br />' <br />clock conattuon until - <br />cti the liner it completed. <br />E. Carrier PiPOline: specifications are as tollowSm. <br />.1. <br />Reinforced Conprets pipe <br />a. Materials: Modified boll and spigot or tongue <br />and gtoove in accordance with current ASTM <br />Specification C76 Class. V for Rativiy' <br />strength . Pip* or current specificiation for <br />Pre4tiessed concrete <br />
The URL can be used to link to this page
Your browser does not support the video tag.