My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-057
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 12:51:00 PM
Creation date
4/14/2020 10:51:52 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Signing and Pavement Markings will be included within the Construction <br />Documents. All signing and pavement markings are to be prepared in accordance <br />with the latest design standards and practices (MUTCD), FDOT Standard <br />Specifications, Indexes, and COUNTY standards. <br />d. Plans shall include spot grades adequate to describe any proposed grading. <br />e. Match lines shall not be located within the limits of an intersection. <br />f. If applicable, soil boring information shall be plotted on cross sections with soil <br />classification and high season water table. <br />g. All quantities shall reference FDOT Pay Item Numbers. <br />h. All details shall reference FDOT Index Numbers, where applicable. <br />i. All specifications shall reference the FDOT Specifications for Road and Bridge <br />Construction. Any deviations or special specifications not included in FDOT <br />Specifications will be provided in the Technical Specifications. <br />2. Task 2 — Intersection Signing and Pavement Marking Plans <br />Signing and Pavement Marking plans shall include: Preparation of the plan layout, key <br />map, quantities (including signing and pavement marking quantity), tabulation of <br />quantities, and detail of major signs. Plans are to be prepared in accordance with the <br />latest design standards and practices (MUTCD), FDOT Standard Specifications, Indexes, <br />and shall be accurate, legible, complete in design and drawn at the same scale as the <br />Roadway Plans, furnished in reproducible form. <br />C. Cost Estimates <br />The consultant will produce three (3) Opinion of Probable Cost (OPC) at the designated <br />milestones of the project. A summary of pay items sheet shall be prepared with all required <br />initial (30%), interim (60%) and Final (100%) plans submission. The final plans (signed and <br />sealed) will be provided to COUNTY based upon English units and provided in digital and PDF <br />formats. <br />D. Bidding Phase <br />The COUNTY shall be responsible for setting the providing the front-end bid documents, bid <br />opening date, advertisement of the bid, scheduling the pre-bid meeting, and scheduling the bid <br />opening. The Consultant will provide the following: <br />• Preparation of Civil and Traffic Plan Documents for Bidding <br />• Attendance at Pre -Bid Meeting (Both civil and traffic representatives will be in attendance) <br />• Response to requests for additional information (RAIs) for bidders <br />NOTE: All construction specifications will be on the applicable plan sheets in lieu of a <br />specifications manual. The Consultant will prepare a pdf file of the final bid package for the <br />COUNTY's use in distribution to prospective bidders via Demandstar. <br />
The URL can be used to link to this page
Your browser does not support the video tag.