EXHIBIT B - SCHEDULE <br />Upon authorization to proceed by the COUNTY, the above described services will be provided based <br />on the following schedule: <br />• Initial Submittal (30% design drawings) <br />• Interim Submittal (60% design drawings) <br />• Final Submittal (100% design drawings) <br />3 months from issuance of Notice to Proceed <br />5 months from issuance of Notice to Proceed <br />7 months from issuance of Notice to Proceed <br />EXHIBIT C - DELIVERABLES <br />The CONSULTANT shall provide the COUNTY with the following at the designated milestones: <br />• Initial (30%) completion: <br />o Three (3) sets of plans in 24" x 36" format <br />o One (1) Opinion of Probable Cost (OPC) <br />o One (1) CD with drawings in PDF format <br />• Interim (60%) completion: <br />o Three (3) sets of plans in 24" x 36" format <br />o One (1) Opinion of Probable Cost (OPC) <br />o One (1) CD with drawings in PDF format <br />• Final (100%) completion: <br />o Three (3) sets of plans in 24" x 36" format (signed & sealed) <br />o One (1) Opinion of Probable Cost (OPC) <br />o One (1) electronic version of the plans in pdf and CAD format <br />