Laserfiche WebLink
WORK ORDER 3 <br />Dune Crossover Replacement at the Sea Grape Trail Beach Access <br />Coastal Engineering Services <br />This Work Order Number 3 is entered into as of this 7th day of April <br />2020, pursuant to that certain Continuing Architectural Services Agreement for Professional <br />Services entered into as of the 17th day of April, 2018 (collectively referred to as the <br />"Agreement"), by and between INDIAN RIVER COUNTY, a political subdivision of the State of <br />Florida ("COUNTY") and Coastal Waterways Design & Engineering LLC ("CONSULTANT"). <br />The COUNTY has selected the CONSULTANT to perform the professional services set forth <br />on Exhibit A (Scope of Work), attached to this Work Order and made part hereof by this <br />reference. The professional services will be performed by the CONSULTANT for the fee schedule <br />set forth in Exhibit B (Fee Schedule), attached to this Work Order and made a part hereof by this <br />reference. The CONSULTANT will perform the professional services within the timeframe more <br />particularly set forth in Exhibit C (Time Schedule), attached to this Work Order and made a part <br />hereof by this reference all in accordance with the terms and provisions set forth in the <br />Agreement. Pursuant to paragraph 1.4 of the Agreement, nothing contained in any Work Order <br />shall conflict with the terms of the Agreement and the terms of the Agreement shall be deemed <br />to be incorporated in each individual Work Order as if fully set forth herein. <br />EXHIBIT A — SCOPE OF WORK <br />Dune Crossover Replacement at the Sea Grape Trail Beach Access <br />The County seeks to replace the dune crossover access to the beach at Sea Grape Trail Park that <br />would be positioned on the site to minimize damage of the new structure and seek to minimize <br />associated disruption of service to park goers, or to be designed to minimize storm related <br />damage so that the structure can be made operational in an efficient and timely manner. This <br />proposal is to design and seek state and local permits and to provide construction administration <br />services for a Sea Grape Trail dune crossover structure to replace the existing damaged structure. <br />The objective of this design is to provide a new structure that is more resistant to storm damage <br />through repositioning the new crossover or by design, or a combination of both. <br />The requested professional coastal engineering and environmental services are limited to <br />Permitting, Design and Construction Administration Services for replacement of the Sea Grape <br />Trail Dune Crossover structure: <br />Page 1 of 8 <br />