Laserfiche WebLink
Work Order No. 32 <br />HHW/Recycling Concept <br />During the site investigation phase of the project, Kimley-Horn will: <br />1. Establish storm -water management criteria specific to the proposed development and to determine <br />the type(s) of permit(s) required. <br />2. Request record drawings of the existing water and sewer system. Determine minimum fire protection <br />water supply requirements relating to proposed facilities. <br />3. Perform up to two (2) site visit to observe existing conditions, verify survey features and document <br />the site. <br />4. Obtain a Design Ticket from Sunshine State one call of Florida (SSOCOF) to verify utility providers <br />within or near the project site. <br />5. Request utility as -built records for utility providers responding to the SSOCOF design ticket. <br />6. Review FEMA Maps forthe site to determine recommended Finished Floor Elevation and lowest grade <br />elevations for the Project. <br />7. Provide a list of survey and geotechnical requirements/deficiencies and coordinate with respective <br />parties. <br />Task 2 — Site Plan Alternatives and Order -of -Magnitude Costs <br />Consultant will meet with County staff to discuss Project priorities and needs and develop a program for <br />the proposed facilities to be constructed as part of the Project. Consultant will prepare up to two (2) <br />alternative site plans and accompanying Opinions of Probable Cost (OPCS) for the Project based upon <br />the identified Project needs and priorities for Client review. <br />The proposed improvements anticipated to be included within the scope of work are anticipated to be: <br />• Re -alignment of existing internal road <br />• Demolition of existing HHW, Recycling, and Cardboard facilities <br />• Construction of new, combine HHW, Recycling, and Educational facility <br />• Associated sitework improvements <br />Consultant will engage a subconsultant, CMK Design Studio, Inc. (CMK), to assist in preparing site plans <br />and OPCS for the Project. <br />Task 3 - Conceptual Plans and Planning Opinion of Probable Cost <br />Based upon feedback provided on the two (2) alternatives evaluated in Task 2 above, the Consultant will <br />revise the selected alternative with final comments from the Client to prepare a final conceptual plan for <br />the Project which shall be the basis for final design (under a separate work order). Consultant will <br />update the planning level OPC and provide to the Client for use in budgeting for the Project. <br />Consultant will prepare a two-dimensional and 3-dimensional rendering of the final site plan for use in <br />informational materials related to the Project. <br />DELIVERABLES <br />Task 1—Survey in PDF and CAD and existing conditions plan <br />Task 2 —Site Plan Alternatives and Order -of -Magnitude Opinion of Probable Cost for each Alternative <br />Task 3 — Conceptual Plans for Project and Opinion of Probable Cost for Selected Alternative <br />Page 3 of 6 <br />