Laserfiche WebLink
Work Order No. 32 <br />HHW/Recycling Concept <br />ASSUMPTIONS <br />The Scope of Services and associated fees are as specifically states above and are based on the following <br />assumptions. If additional information reveals material differences between these assumptions and <br />Project needs or regulatory requirements the Consultant shall proceed only upon receipt of a <br />supplemental work order: <br />• Landscape architectural design services (proposed landscape and hardscape, irrigation, tree <br />mitigation, etc.) are not included in this scope of services but can be provided as additional <br />services. <br />• For this proposal Kimley-Horn assumes that adjacent, existing water and sewer mains are of <br />sufficient size, depth and capacity to serve the project. <br />• Dry utilities (duct banks, electrical, communications, etc.) and gas utilities shall be designed <br />by others and coordinated with Kimley-Horn. <br />• The proposed development of the site will not require any archaeological or historical <br />evaluations or studies under this scope of services. <br />Information to be provided by the COUNTY includes: <br />• Available site surveys and plans <br />Geotechnical Engineering report for the project providing vehicular and pedestrian <br />pavement design recommendations and percolation test results, soil suitability, borings <br />of unsuitable soils depths, and other pertinent information <br />Page 4 of 6 <br />