My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br />SITE CLEANUP AND RESTORATION <br />G. It is the intent of the Specifications to place the responsibility on the <br />CONTRACTOR to restore to their original condition all items disturbed, <br />destroyed, or damaged during construction. Particular attention will be <br />placed on restoration of canals to equal or better condition than prior to <br />construction. <br />H. When finished surfaces require cleaning with cleaning materials, use only <br />those cleaning materials which will not create hazards to health or <br />property and which will not damage the surfaces. Use cleaning materials <br />only on those surfaces recommended by the manufacturer. Follow the <br />manufacturer's directions and recommendations at all times. <br />Keep the amount of dust produced during construction activities to a <br />minimum. At CONTRACTOR's expense, spray water or other dust control <br />agents over the areas, which are producing the dust. Schedule <br />construction operations so that dust and other contaminants will not fall on <br />wet or newly coated surfaces. <br />1.3 SITE CLEANUP AND RESTORATION <br />Prior to final completion, the OWNER, ENGINEER and CONTRACTOR shall <br />review the site with regards to site cleanup and restoration. Clean and/or restore <br />all items determined to be unsatisfactory by the OWNER or ENGINEER, at no <br />additional expense. <br />+ + END OF SECTION + + <br />01710 Site Cleanup <br />01710-2 <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\IRC_ 1503_ BID_ CONTRACT_ Add Date\01710 - Site Cleanup.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.