My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01820 <br />Post Final Inspection <br />1.1 GENERAL <br />A. Approximately one year after Final Completion, the OWNER will make <br />arrangements with the Construction Coordination Manager and the <br />CONTRACTOR for a post final inspection and will send a written notice to said <br />parties to. inform them of the date and time of the inspection. <br />B. Corrections of defective work noted by OWNER and Construction Coordination <br />Manager shall comply with the applicable sections of Article 13, General <br />Conditions. <br />C. After the inspection, the OWNER will inform the CONTRACTOR of any <br />corrections required to release the performance and payment bonds. <br />001820 - Post Final Inspection rev 05-13 <br />001820-1 <br />FAPublic Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid Documents\IRC_1503_BID_CONTRACT_Add Date\001820 <br />- Post Final Inspection rev 05-13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.