My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
maintenance within the limits of construction shall include the mowing of all <br />existing grassed areas within the Right -of -Way, removal of all trash and debris <br />on a weekly basis, and keeping vegetation trimmed on all sidewalks. Grass <br />height shall not exceed 6" without mowing. Clippings shall be removed from <br />sidewalk. <br />Item of Payment <br />Payment for the work specified in this item shall be made under: <br />Bid Item No. 101-1 - Mobilization - Per Lump Sum <br />SECTION 102 - MAINTENANCE OF TRAFFIC <br />The work specified in this item shall conform to Section 102 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction, except as <br />modified herein. <br />A. GENERAL PROVISIONS -DESCRIPTION: The work specified in this Section <br />consists of maintaining traffic within the limits of the project for the duration of the <br />construction period, including any temporary suspensions of the work. It shall <br />include the construction and maintenance of any necessary detour facilities; the <br />providing of necessary facilities for access to residences, businesses, etc., along the <br />project; the furnishing, installing and maintaining of traffic control and safety devices <br />during construction, the control of dust through the use of calcium chloride if <br />necessary, and any other special requirements for safe and expeditious movement <br />of traffic as may be called for on the plans. The term,. Maintenance of Traffic, as <br />used herein, shall include all of such facilities, devices and operations as are <br />required for the safety and convenience of the public as well as for minimizing public <br />nuisance; all as specified in this Itemized Section 14 of these provisions and <br />Paragraph 24 in General Conditions Section. <br />B. BEGINNING DATE OF CONTRACTOR'S RESPONSIBILITY: The Contractor shall <br />present his Maintenance of Traffic Plan at the pre -construction conference. The <br />Maintenance of Traffic Plan shall indicate the type and location of all signs, lights, <br />barricades, striping and barriers to be used for the safe passage of pedestrians and <br />vehicular traffic through the project and for the protection of the workmen. The plan <br />will indicate conditions and setups for each phase of the Contractor's activities. <br />When the project plans include or specify a specific Maintenance of Traffic Plan, <br />alternate proposals will be considered when they are found to be equal to or better <br />than the plan specified. <br />In no case may the Contractor begin work until the Maintenance of Traffic Plan has <br />been approved in writing by the Engineer. Modifications to the Maintenance of <br />Traffic Plan that become necessary shall also be approved in writing. Except in an <br />emergency, no changes to the approved plan will be allowed until approval to <br />change such plan has been received. <br />01025-2 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.