Laserfiche WebLink
The cost of all work included in the Maintenance of Traffic Plan shall be included in <br />the pay item for Maintenance of Traffic. <br />The Contractor shall be responsible for performing daily inspections, including <br />weekends and holidays, with some inspections at nighttime, of the installations on <br />the project and replace all equipment and devices not conforming with the approved <br />standards during that inspection. The project personnel will be advised of the <br />schedule of these inspections and be given the opportunity to join in the inspection <br />as is deemed necessary. <br />C. TRAFFIC CONTROL - STANDARDS: The FDOT Design Standards For Design <br />Construction, Maintenance and Utility Operations On The State Highway System, <br />Edition as dated on the plans set forth the basic principles and prescribes minimum <br />standards to be followed in the design, application, installation, maintenance and <br />removal of all traffic control devices and all warning devices and barriers which are <br />necessary to protect the public and workmen from hazards within the project limits. <br />The standards established in the aforementioned manual constitute the minimum <br />requirements for normal conditions, and additional traffic control devices warning <br />devices, barriers or other safety devices will be required where unusual, complex or <br />particularly hazardous conditions exist. <br />The above referenced standards were developed using F.H.W.A., U.S.D.O.T. <br />Manual on Uniform Traffic Control Devices (MUTCD). <br />D. TRAFFIC CONTROL DEVICES, WARNING DEVICES AND BARRIERS - <br />INSTALLATION: The responsibility for installation and maintenance of adequate <br />traffic control devices, warning devices and barriers, for the protection of the travel in <br />public and workmen, as well as to safeguard the work area in general shall rest with <br />the Contractor. Consideration shall be given to recommendations of the Engineer. <br />The required traffic control devices, warning devices and barriers shall be erected by <br />the Contractor prior to creation of any hazardous condition and in conjunction with <br />any necessary re-routing of traffic. The Contractor shall immediately remove, turn or <br />cover any devices or barriers which do not apply to existing conditions. All traffic <br />control devices shall conform to MUTCD standards and shall be clean and relatively <br />undamaged. Damaged devices diminishing legibility and recognition, during either <br />night or day conditions, are not acceptable for use. <br />E. NO WAIVER OF LIABILITY: The Contractor shall conduct his operations in such a <br />manner that no undue hazard will result due to the requirements of this article, and <br />the procedures and policies described therein shall in no way act as a waiver of any <br />of the terms of the liability of the Contractor or his surety. <br />F. Contractor's Maintenance of Traffic Plan shall maintain continuous vehicular traffic <br />on 43rd Avenue at all times. The Contractor shall maintain one lane of traffic at all <br />times during 43rd Avenue cross drain culvert constructions. <br />G. In addition to above, the Contractor shall comply with INDIAN RIVER COUNTY <br />TRAFFIC ENGINEERING DIVISION SPECIAL CONDITIONS FOR RIGHT-OF-WAY <br />CONSTRUCTION in Appendix C. <br />01025-3 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\Technical Specifications.doc <br />