My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Arrange for the use of all non-public haul routes crossing the property <br />of any railroad. Incur any expense for the use of such haul routes. Establish haul routes <br />which will direct construction vehicles away from developed areas when feasible, and keep <br />noise from hauling operations to a minimum. Advise the Engineer in writing of all proposed <br />haul routes. <br />120-5.3.2 Borrow Material for Shoulder Build-up: When so indicated in the <br />plans, furnish borrow material with a specific minimum bearing value, for building up of <br />existing shoulders. Blend materials as necessary to achieve this specified minimum bearing <br />value prior to placing the materials on the shoulders. Take samples of this borrow material <br />at the pit or blended stockpile. <br />120-5.4 Materials Used at Pipes, Culverts, etc.: Construct embankments over and <br />around pipes, culverts, and bridge foundations with selected materials. <br />120-6 Embankment Construction. <br />120-6.1 General: Construct embankments in sections of not less than 300 feet in <br />length or for the full length of the embankment. <br />120-6.2 Dry Fill Method: <br />120-6.2.1 General: Construct embankments to meet compaction <br />requirements in 120-7 and in accordance with the acceptance program requirements in <br />120-9. Restrict the compacted thickness of the last embankment lift to 6 inches maximum. <br />As far as practicable, distribute traffic over the work during the <br />construction of embankments so as to cover the maximum area of the surface of each <br />layer. <br />Construct embankment in the dry whenever normal dewatering <br />equipment and methods can accomplish the needed dewatering. <br />120-6.2.1.1 For A-3 and A-2-4 Materials with up to 15% fines: <br />Construct the embankment in successive layers with lifts up to a maximum compacted <br />thickness of 12 inches. Ensure the percentage of fines passing the No. 200 US Standard <br />sieve in the A-2-4 material does not exceed 15%. <br />120-6.2.1.2 For A-1 Plastic materials (As designated. in FDOT <br />Design Standard Index 505) and A-2-4 Materials with greater than 15% fines: <br />Construct the embankment in successive layers with lifts up to a maximum compacted <br />thickness of 6 inches. <br />120-6.2.1.3 Equipment and Methods: Provide normal dewatering <br />equipment including, but not limited to, surface pumps, sump pumps and trenching/digging <br />machinery. Provide normal dewatering methods including,. but not limited to, constructing <br />shallow surface drainage trenches/ditches, using sand blankets, sumps and siphons. <br />When normal dewatering does not adequately remove the <br />water, the Engineer may require the embankment material to be placed in the water or in <br />low swampy ground in accordance with 120-7.2.4. <br />120-6.2.2 Placing in Unstable Areas: Where depositing the material in <br />water, or in low swampy ground that will not support the weight of hauling equipment, <br />construct the embankment by dumping successive loads in a uniformly distributed layer of <br />a thickness not greater than necessary to support the hauling equipment while placing <br />subsequent layers. Once sufficient material has been placed so that the hauling equipment <br />can be supported, construct the remaining portion of the embankment in layers in <br />accordance with the applicable provisions of 120-7.2.4 and 120-7.2.6. <br />120-6.2.3 Placing on Steep Slopes: When constructing an embankment on <br />a hillside sloping more than 20 degrees from the horizontal, before starting the fill, deeply <br />01025-19 Technical Specifications <br />R\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\Technical Specifications.doc <br />