My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
plow or cut into steps the surface of the original ground on which the embankment is to be <br />placed. <br />120-6.2.4 Placing Outside Standard Minimum Slope: Where material that <br />is unsuitable for normal embankment construction is to be used in the embankment outside <br />the standard minimum slope (approximately one to two), place such material in layers of <br />not more than 18 inches in thickness, measured loose. The Contractor may also place <br />material which is suitable for normal embankment, outside such standard minimum slope, <br />in 18 inch layers. Maintain a constant thickness for suitable material placed within and <br />outside the standard minimum slope, unless placing in a separate operation. <br />120-6.3 Hydraulic Method: <br />120-6.3.1 Method of Placing: When the hydraulic method is used, as far as <br />practicable, place all dredged material in its final position in the embankment by such <br />method. Place and compact any dredged material that is re -handled, or moved and placed <br />in its final position by any other method, as specified in 120-7.2. The Contractor may use <br />baffles or any form of construction he may select, provided the slopes of the embankments <br />are not steeper than indicated in the plans. Remove all timber used for temporary <br />bulkheads or baffles from the embankment, and fill and thoroughly compact the holes thus <br />formed. When placing fill on submerged land, construct dikes prior to beginning of <br />dredging, and maintain the dikes throughout the dredging operation. <br />120-6.3.2 Excess Material: Do not use excess material placed outside the <br />prescribed slopes, below the normal high-water level, to raise the fill. Remove only the <br />portion of this material required for dressing the slopes. <br />120-6.3.3 Protection of Openings in Embankment: Leave openings in the <br />embankments at the bridge sites. Remove any material which invades these openings or <br />existing channels without additional compensation to provide the same depth of channel as <br />existed before the construction of the embankment. Do not excavate or dredge any <br />material within 200 feet of the toe of the proposed embankment. <br />120-7 Compaction Requirements. <br />120-7.1 Moisture Content: Compact the materials at a moisture content such that <br />the specified density can be attained. If necessary to attain the specified density, add water <br />to the material, or lower the moisture content by manipulating the material or allowing it to <br />dry, as is appropriate. <br />120-7.2 Compaction of Embankments: <br />120-7.2.1 Earthwork Category 1 and 2 Density Requirements: The <br />Engineer will accept a minimum density of 95% of the maximum density as determined by <br />AASHTO T-99 Method C for all earthwork items requiring densities. <br />120-7.2.2 Earthwork Category 3 Density Requirements: The Engineerwill <br />accept a minimum of 100% of the maximum density as determined by AASHTO T-99 <br />Method C for all densities required under category 3. <br />Except for embankments constructed by the hydraulic method as specified in 120-6.3, and <br />for the material placed outside the standard minimum slope as specified in 120-6.2.4, and <br />for other areas specifically excluded herein, compact each layer of the material used in the <br />formation of embankments to the required density stated above. Uniformly compact each <br />layer using equipment that will achieve the required density, and as compaction operations <br />progress, shape and manipulate each layer as necessary to ensure uniform density <br />throughout the embankment. <br />120-7.2.3 Compaction Over Unstable Foundations: Where the <br />embankment material is deposited in water or on low swampy ground, and in a layer thicker <br />01025-20 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\Technical Specifications.doc <br />