My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
than 12 inches (as provided in 120-6.2.2), compact the top 6 inches (compacted thickness) <br />of such layer to the density as specified in 120-9.5. <br />120-7.2.4 Compaction Where Plastic Material Has Been Removed: Where <br />unsuitable material is removed and the remaining surface is of the A-4, A-5, A-6, or A-7 Soil <br />Groups, as determined by the Engineer, compact the surface of the excavated area by <br />rolling with a sheepsfoot roller exerting a compression of at least 250 psi on the tamper <br />feet, for the full width of the roadbed (subgrade and shoulders). Perform rolling before <br />beginning any backfill, and continue until the roller feet do not penetrate the surface more <br />than 1 inch. Do not perform such rolling where the remaining surface is below the normal <br />water table and covered with water. Vary the procedure and equipment required for this <br />operation at the discretion of the Engineer. <br />120-7.2.5 Compaction of Material To Be Used In Base, Pavement, or <br />Stabilized Areas: Do not compact embankment material which will be incorporated into a <br />pavement, base course, or stabilized subgrade, to be constructed as a part of the same <br />Contract.. <br />120-7.2.6 Compaction of Grassed Shoulder Areas: For the upper 6 inch <br />layer of all shoulders which are to be grassed, since no specific density is required, <br />compact only to the extent directed. <br />120-7.2.7 Compaction of Grassed Embankment Areas: For the outer layer <br />of all embankments where plant growth will be established, do not compact. Leave this <br />layer in a loose condition to a minimum depth of 6 inches for the subsequent seeding or <br />planting operations. <br />120-7.3 Compaction of Subgrade: If the plans do not provide for stabilizing, <br />compact the subgrade in both cuts and fills to the density specified in 120-9.5. For <br />undisturbed soils, do not apply density requirements where constructing narrow widening <br />strips or paved shoulders 5 feet or less in width. <br />Where trenches for widening strips are not of sufficient width to permit the use <br />of standard compaction equipment, perform compaction using vibratory rollers, trench <br />rollers, or other type compaction equipment approved by the Engineer. <br />Maintain the required density until the base or pavement is placed on the <br />subgrade. <br />120-8 Backfilling Around Structures and Pipe. <br />120-8.1 Requirements for all Structures: <br />120-8-1.1 General: Backfill around structures and pipe in the dry whenever <br />normal dewatering equipment and methods can accomplish the needed dewatering. <br />129-8.1.2 Equipment and Methods: Provide normal dewatering equipment <br />including, but not limited to, surface pumps, sump pumps, wellpoints and header pipe and <br />trenching/digging machinery. Provide normal dewatering methods including, but not limited <br />to, constructing shallow surface drainage trenches/ditches, using sand blankets, perforated <br />pipe drains, sumps and siphons. <br />120-8.1.3 Backfill Materials: Backfill to the original ground surface or <br />subgrade surface of openings made for structures, with a sufficient allowance for <br />settlement. The Engineer may require that the material used for this backfill be obtained <br />from a source entirely apart from the structure. <br />Do not allow heavy construction equipment to cross over culvert or <br />storm sewer pipes until placing and compacting backfill material to the finished earthwork <br />grade or to an elevation at least 4 feet above the crown of the pipe. <br />01025-21 Technical Specifications <br />F \Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Or to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\Technical Specifications.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.