My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
120-8.1.4 Use of A-7 Material: In the backfilling of trenches, A-7 material <br />may be used from a point 12 inches above the top of the pipe up to the elevation shown on <br />the FDO.T Design Standards as the elevation for undercutting of A-7 material. <br />120-8.1.5 Time of Placing Backfill: Do not place backfill against any <br />masonry or concrete abutment, wingwall, or culvert until the Engineer has given permission <br />to do so, and in no case until the masonry or concrete has been in place seven days or <br />until the specified 28 -day compressive strength occurs. <br />120-8.1.6 Placement and Compaction: When the backfill material is <br />deposited in water, compact per 120-8.2.5 and 120-8.3.4. Place the material in horizontal <br />layers not exceeding 6 inches compacted thickness, in depth above water level, behind <br />abutments, wingwalls and end bents or end rest piers, and around box culverts and all <br />structures including pipe culverts. The Engineer may approve placing material in thicker lifts <br />of no more than 12 inches compacted thickness above the soil envelope if a test section <br />demonstrates the required density can be achieved. Approval will be based on five passing <br />density tests over the test section consisting of a lift of backfill from structure to structure. <br />The Engineer will identify the test section with the compaction effort and soil classification in <br />the Agency Logbook. In case of a change in compaction effort or soil classification, <br />construct a new test section. The Engineer reserves the right to terminate the Contractor's <br />use of thick lift construction and have him revert to the 6 inch compacted lifts whenever it is <br />determined that satisfactory results are not being obtained. <br />120-8.2 Additional Requirements for Structures Other than Pipe: <br />120-8.2.1 Density: Where the backfill material is deposited in water, obtain a. <br />12 inch layer of comparatively dry material, thoroughly compacted by tamping, before the <br />Engineer verifies layer and density requirements. Meet the requirements of the density <br />Acceptance Criteria. <br />120-8.2.2 Box Culverts: For box culverts over which pavement is to be <br />constructed, compact around the structure to an elevation not less than 12 inches above <br />the top of the structure, using rapid -striking mechanical tampers. <br />120-8.2.3 Other Limited Areas: Compact in other limited areas using <br />mechanical tampers or approved hand tampers, until the cover over the structure is at least <br />12 inches thick. When hand tampers are used, deposit the materials in layers not more <br />than 4 inches thick using hand tampers suitable for this purpose with a face area of not <br />more than 100 int. Take special precautions to prevent any wedging action against the <br />masonry, and step or terrace the slope bounding the excavation for abutments and <br />wingwalls if required by the Engineer. <br />120-8.2.4 Culverts and Piers: Backfill around culverts and piers on both <br />sides simultaneously to approximately the same elevation. <br />120-8.2.5 Compaction Under Wet Conditions: Where wet conditions do not <br />permit the use of mechanical tampers, compact using hand tampers. Use only A-3 material <br />for the hand tamped portions of the backfill. When the backfill has reached an elevation and <br />condition such as to make the use of the mechanical tampers practical, perform mechanical <br />tamping in such manner and to such extent as to transfer the compaction force into the <br />sections previously tamped by hand. <br />120-8.3 Additional Requirements for Pipe 15 Inches Inside Diameter or Greater: <br />120-8.3.1 General: Trenches for pipe may have up to four zones that must be <br />backfilled. <br />Lowest Zone: The lowest zone is backfilled for deep undercuts up to <br />within 4 inches of the bottom of the pipe. <br />01025-22 Technical Specifications <br />F:\Public Works\ENGINEERING DIVISION PROJECTS\1503-43rd Ave Swk_Airport Dr to 41st St\1-Admin\Bids\Bid <br />Documents\Master Contract Documents\Technical Specifications.doc <br />