My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-042B
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-042B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 10:56:41 AM
Creation date
4/21/2020 2:52:38 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
03/10/2020
Control Number
2020-042B
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation
FDOT
Subject
43rd Avenue Sidewalk from Airport Drive West to 41st Street
Contract Documents and Specifications
Project Number
IRC-1503
Bid Number
2020016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• All required forms must be completed and on time or payment could be withheld. <br />• Job Site Bulletin Board is required to be maintained until project is completed. The bulletin <br />board information will be provided by the FDOT. The Contractor is required to properly <br />display and maintain the bulletin board information. <br />• Summary of required contractor form submittals checklist (Section 200-8 in contract <br />documents) A -P. <br />• Current Wage Determination. * Please Note Common/General Laborer Rates. The Wage <br />Determination provided in the Bid Documents was superseded on December 13, 2019. <br />• Section 00470 (Contract Documents) DBE Bid Package Information—Every Prime Contractor <br />submitting a bid must submit a Bid Opportunity List within 3 days of Bid opening. Notice <br />2020018 includes the information. <br />• Florida Department of Transportation, Equal Employment Opportunity Construction <br />Contract Compliance Manual, March 8, 2019. <br />Available on website: <br />https:Hfdotwww.blob.core.windows.net/sitefinity/docs/default-source/equalopporunity/contract- <br />compliance/contract-compliance-manual.pdf?sfvrsn=5e8c3002 0 <br />DISCUSSION <br />• The questions received by the Purchasing Division from potential bidders were read aloud <br />with corresponding answers. These questions and answers will be issued in Addendum #2. <br />• The sidewalk location that crosses the driveway at station 27+22.49 to 27+49.81 will require <br />reinforcing bars three feet before and three feet after the driveway stations. <br />• The County will accept DBE's (a Disadvantaged Business Enterprise) for this project. <br />• A testing lab has not yet been chosen to perform testing. The costs of any testing that fails <br />will be the responsibility of the Contractor. <br />• The quantity for embankment did not include the material to be generated by clearing and <br />grubbing. <br />• Addendum #1 was issued with a correction on the Itemized Bid Schedule. <br />• Addendum #2 will be issued with another correction to the Itemized Bid Schedule (in <br />addition to the items listed above in, "Other Issues"). <br />• There are no other restrictions during the work hours when working adjacent to the airport. <br />Only one lane can be closed at a time. <br />• A notice of lane closures must be given a minimum of 72 hours in advance to the Indian <br />River County Traffic Engineering Division. This led to adding a revised Appendix C (Indian <br />River County Traffic Engineering Division Special Conditions for Right -of -Way Construction) <br />to this addendum as the existing one stated 24 hours. <br />• The Contractor shall submit the appropriate Index to FDOT for lane closures. <br />• The road classification for 43rd Avenue was researched after the meeting and the answer <br />appears in the attached list of questions and answers. <br />• There is currently no final dollar amount to the LAP Agreement as the project has not been <br />bid. The amount will be determined once the bids are known and the current amount may <br />change. <br />• The term of agreement with FDOT is for project completion on or before December 31, <br />2021. <br />• The "Buy America Certificate of Compliance" should include the FM project number (FM No. <br />440019-1-58-01) so that it is project specific. <br />F:\Public Works\ENGINEERING DIVISION PROJECIS`d503-43rd Ave Swk_Airport Dr to 41st St\I-Admin\MeetineS\PreBid\I 503 Pre -Bid <br />Meeting Minutes 20200107.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.