Laserfiche WebLink
The total cost to reconstruct and resurface the existing 1.5 mile <br />section of 66th Avenue is $93,970.47. Since Orange County and <br />Brevard County bid large quantities of the work (500,000 square <br />yards), staff is of the opinion that the above prices are excellent <br />and Indian River County should piggy -back the Orange County -and <br />Brevard County bids. The additional cost of $21,970.47 can be <br />allocated from Road and Bridge Division's other Road Material <br />account 111-214-541-035.39 ($220,548 available as of February 28, <br />1995) . <br />If 66th Avenue is closed to through traffic between 33rd Street and <br />45th Street, the work could be completed in approximately 3 weeks. <br />If traffic is maintained to through traffic, the work will take 6-8 <br />weeks. <br />Staff recommends that the County contract with Asphalt Recycling, <br />Inc. in the amount of $20,734.87 and Mariani Asphalt Company in the <br />amount of $16,769.00 to recycle 66th Avenue between 33rd Street and <br />45th Street. The asphalt work at a cost of $56,466.60 will be <br />performed by the County's annual resurfacing contractor Dickerson <br />Florida, Inc. <br />Funding to be from Fund 111-214, Transportation Fund Road and <br />Bridge Division. It is also recommended that the road be closed to <br />through traffic while the work is performed. A simple 2 mile <br />detour to 58th Avenue is available using 45th Street and 33rd <br />Street. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Adams, the Board unanimously <br />approved staff's recommendation as outlined in <br />the memorandum. <br />75 <br />March 14, 1995 <br />BON U4ft�1C �ti <br />