Laserfiche WebLink
Mr. Himanshu H. Mehta, P.E. <br />2 April 2020 <br />Page 4 <br />Geosyntec <br />consultants <br />samplers and traditional low -flow sampling techniques. PDBs are anticipated to be purchased from <br />EON Products, one of the few suppliers of this type of passive sampling device. Groundwater <br />sampling activities will be executed using a two -person sampling crew and will be performed in <br />general accordance with the FDEP Standard Operating Procedures (SOPS). The proposed summer <br />2020 field event (tentatively scheduled for June) will include sampling of nine monitoring wells <br />(six wells using PDBs and three wells with traditional sampling techniques). The summer 2020 <br />field event is budgeted to include one day for groundwater sampling activities and one day for <br />PDB deployment for the next sampling event (total of two field days each with two persons). The <br />proposed winter 2020 field event (tentatively scheduled for December) will include sampling of <br />47 monitoring wells (38 wells using PDBs and nine wells with traditional sampling techniques). <br />The winter 2020 field event is budgeted to include a total of three and one-half days (with two <br />persons) for groundwater sampling activities and PDB deployment for the summer 2020 field <br />event. Consistent field documentation and field protocols will be utilized to develop reliable data <br />to support the natural attenuation evaluation for the groundwater plume. The groundwater samples <br />will be analyzed in accordance with the sampling plan summarized in the 2019 Annual <br />Groundwater Monitoring Report. Quality control samples are proposed to be collected at a rate of <br />5% of total samples as required by the most recent FDEP SOPS. <br />Geosyntec will conduct a complete round of groundwater level measurements concurrent with <br />each semi-annual groundwater sampling event (budgeted for one day with two -person field team <br />for each event). Depth to groundwater measurements will be recorded to the nearest 0.01 -ft in each <br />monitoring well, including existing monitoring wells and applicable City of Vero Beach wells <br />(assumed up to 95 wells per event). Due to wet site conditions and difficult access to certain well <br />clusters, costs for rental of a utility task vehicle are included for one day of groundwater level <br />measurements and one day of sampling per event (4 total days). <br />It is anticipated that purge water (investigation -derived waste [IDW]) will be containerized in 55 - <br />gallon polyethylene drums and temporarily staged on Site for characterization prior to removal <br />and disposal. Costs are included herein for purchase and delivery to the site for two 55 -gallon <br />polyethylene drums and for one-half day of drum disposal oversight for one person. <br />During the monitoring well inventory conducted by Geosyntec personnel during the winter 2019 <br />field event, approximately 20 well clusters were noted to be overgrown by brush or tall grass <br />impeding access for sample collection. Geosyntec will provide oversight for a contractor to clear <br />brush in an approximate 6 ft radius around select well clusters in conjunction with the winter 2020 <br />field event to maintain access to well clusters. Costs are included for two days oversight (with one <br />person) and for subcontractor costs. <br />FR0766\XR20017 <br />engineers I scientists I innovators <br />