My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-081
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2021 3:28:54 PM
Creation date
4/30/2020 4:22:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
04/21/2020
Control Number
2020-081
Agenda Item Number
15.B.2.
Entity Name
Geosyntec Consultants, Inc.
Subject
Work Order 7
South Gifford Road Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Himanshu H. Mehta, P.E. <br />2 April 2020 <br />Page 5 <br />Geosynteccl <br />consultants <br />Overall, for field activities, budget has been included for ten and one-half field days for one person, <br />eight field days for a second person, (i.e., 18.5 man days) and associated field expenses for <br />sampling. <br />Task 5—Data Evaluation and Semi -Annual Reporting: Under this task, Geosyntec will perform <br />data evaluation activities and reporting. The reporting includes preparation of one summer 2020 <br />report (simplified format) and one winter 2020 report for submittal to FDEP. <br />The summer 2020 report will be a letter report with attachments, including a monitoring well <br />location map and tables of the field and laboratory results. Data evaluation activities for the <br />summer 2020 report will include database management, screening results against applicable <br />regulatory criteria, and summary data table preparation. This report will be prepared following the <br />June field event. <br />The winter 2020 report will be consistent with the groundwater monitoring reports historically <br />submitted to FDEP for this Site and the data evaluation activities will include database <br />management, screening results against applicable regulatory criteria, GIS figure preparation, time <br />trend analyses, and/or statistical data analyses. The winter 2020 annual report will be supported by <br />attachments containing Chain -of -Custody sheets, field notes and observations, water sampling <br />logs, maps, graphs, analytical results, quantitative statistical evaluation, and other applicable <br />materials. As part of the statistical analysis, trend analysis graphs showing temporal concentrations <br />of constituents and a summary of the Mann -Kendall statistics will be included to identify <br />increasing, decreasing, or no trends in groundwater constituent concentrations. Historical data <br />summaries will be included for monitoring wells recommended for removal from the monitoring <br />plan. <br />The draft summer and winter 2020 reports will be submitted to IRC SWDD for review prior to <br />submittal to FDEP. Each final report will be signed and sealed by a Florida registered professional <br />engineer or geologist. <br />SCHEDULE <br />The semi-annual groundwater sampling events will be tentatively conducted in June and December <br />2020 as described herein. Reports will be submitted to FDEP to meet required deadlines. <br />BUDGET ESTIMATE <br />A budget estimate for the scope of work outlined in Tasks 1 through 5 of this proposal is <br />summarized in the following table, and a detailed budget estimate is provided as Attachment A. <br />The budget estimate presented in this proposal is based on Geosyntec's understanding of the <br />project requirements, our experience gained from executing similar tasks for SWDD since 2002 at <br />the Site, and experience with groundwater monitoring and reporting activities at similar facilities. <br />FR0766\XR20017 <br />engiIieers I scietitists I iiiiiovators <br />
The URL can be used to link to this page
Your browser does not support the video tag.