My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-091
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-091
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 10:38:41 AM
Creation date
5/12/2020 11:44:49 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/05/2020
Control Number
2020-091
Agenda Item Number
8.G.
Entity Name
Florida Department of Transportation (FDOT)
NOTE: final digital signatures added to certified copy
Subject
Highway Maintenance Memorandum of Agreement for bridge over Lateral āCā Canal
County Road 612 (8th Street) West of 74th Avenue
SEE RESO 2020-040 and 2018-039
Document Relationships
2018-039
(Agenda)
Path:
\Resolutions\2010's\2018
2020-040
(Cover Page)
Path:
\Resolutions\2020's\2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 53DAE100-CE83-4F11-BA7C-3D9F289FAAOC <br />A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />1. The recitals set forth above are true and correct and are deemed incorporated herein. <br />2. The DEPARTMENT has undertaken and obtained the approval of Federal participation for the <br />Project. The AGENCY is responsible for additional Project costs determined to be Federal Aid <br />Non -Participating. <br />3. The AGENCY shall allow the DEPARTMENT and its contractors to enter onto the existing AGENCY <br />property. No further permit or agreement from the Agency shall be required to construct this <br />Project. <br />4. The AGENCY shall continue to maintain the existing roadway and any property owned by <br />AGENCY until the DEPARTMENT begins construction of the Project. The AGENCY shall continue <br />to be responsible for mowing and litter removal during the duration of the Project. <br />S. Upon "final acceptance" by the DEPARTMENT of the Project, (as "final acceptance" is described <br />in the Standard Specifications for Roadway and Bridge Construction dated 2019, as amended), <br />and Notice thereof to the AGENCY, the AGENCY shall maintain the Project, at its own cost, in <br />accordance with the following Federally and State accepted standards: (a) FDOT Design Manual <br />(FDM), current edition (b) Florida Green Book dated 2016, as amended (c) Governing standards <br />and specifications: FDOT Design Standards dated FY 2019-20, as amended (d) Standard <br />Specifications for Roadway and Bridge Construction dated 2019, as amended by contract <br />documents, and (e) Manual on Uniform Traffic Control Devices (MUTCD), current edition, or as <br />amended. Maintenance of said Project includes maintaining the proposed bridge, pavement, <br />drainage structures, storm water management systems, signs and pavement markings. The <br />Department shall give the AGENCY ten (10) days' notice before final acceptance. <br />a. The AGENCY grants to the DEPARTMENT all rights necessary to enter and <br />construct the Project. <br />6. No additional right of way is required for the PROJECT. The PROJECT can be completed within <br />the AGENCY's existing right of way. <br />7. Warranties: The DEPARTMENT shall transfer any applicable warranties to the AGENCY. <br />8. Environmental permitting: If requested by the DEPARTMENT, the AGENCY shall sign as a joint <br />applicant and be responsible for the permits related to the Project. Further the AGENCY shall be <br />in compliance with all permits after the construction is complete and the right of way is <br />transferred to the AGENCY. To the extent permitted by law, the AGENCY shall indemnify the <br />DEPARTMENT for any violations by the AGENCY of any permits issued to the Department or <br />jointly to the AGENCY and the DEPARTMENT after construction is complete. The AGENCY shall <br />execute all documentation required by the permitting agencies in a timely manner to accept <br />transfer of the Project. For various occupancy permits the AGENCY shall be the applicant. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.