My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-098
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-098
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 10:58:24 AM
Creation date
5/20/2020 9:51:09 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/12/2020
Control Number
2020-098
Agenda Item Number
8.D.
Entity Name
Aptim Environmental & Infrastructure, LLC
Subject
Beach and Dune Renourishment Project Sector 3
Pre-Construction Services
Work Order No. 2018006-7
Area
Sector 3 (Wabasso Beach)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 <br />)>v <br />APTIM <br />April 3, 2020 <br />Mr. James Ennis <br />Indian River County <br />Public Works - Coastal Engineering Division <br />1801 27th St, Building A <br />Vero Beach, FL 32960 <br />Subject: Indian River County, FL <br />Sector 3 — 2018006 — Work Order #7 <br />Pre -Construction Services <br />Dear James: <br />Aptim Environmental & Infrastructure, LLC. <br />2481 NW Boca Raton Blvd. <br />Boca Raton, FL 33431 <br />Tel: +1 561 391 8102 <br />Fax: +1 561 391 9116 <br />www.aptim.com <br />This proposal outlines a scope of work for Aptim Environmental & Infrastructure, Inc. (APTIM) to provide <br />professional services to Indian River County (the County) in support of continued development of the <br />Sector 3 Beach and Dune Renourishment Project. The Sector 3 shoreline has endured long-standing <br />background erosion primarily due to cumulative impacts of large storm events, most recently effects from <br />Hurricane Matthew in October 2016, Hurricane Irma in September 2017, and Hurricane Dorian in <br />September 2019. The Florida Department of Environmental Protection (FDEP) has designated this area <br />as, "critically eroded with development and recreational interests being threatened" (Critically Eroded <br />Beaches in Florida, FDEP, 2019) (R-20 to R-51.3). As directed from the most recent update of the <br />County's Beach Preservation Plan (2015), the Sector 3 shoreline is to be managed with the "beach fill" <br />strategy. <br />The scope of work described herein is to support the County in continuing to develop the Sector 3 project <br />by performing several pre -construction services. This proposal is intended to follow the design and <br />permitting phase of the Sector 3 project. The tasks to perform this work are listed below and described <br />on the following pages. A breakdown of the hours and expenses to develop the cost is attached. The <br />scope and fee were developed following the provisions of the Professional Services Agreement between <br />Indian River County and APTIM, dated January 9, 2018, to provide engineering and biological support <br />services for the Sector 3 (Wabasso Beach) Beach and Dune Renourishment Project (RFQ#2018006) <br />Task 1: Continued Coordination with Permitting Agencies <br />It is anticipated that FDEP will issue the final permit between April 2020 and May 2020. The continued <br />coordination with permitting agencies task in this work order is to incorporate any additional comments <br />or stipulations issued in the final FDEP and/or USACE permits issued for the project. Language within <br />the technical specifications will be updated to conform to permit requirements. The final sediment QA/QC <br />Plan, final FDEP Permit, and final USACE permit will be included in the bid documents. This task also <br />includes any coordination required with the permitting agencies and the County leading up to the <br />issuance of the Final Order including (Draft Permit, Notice of Intent (NOI), Public Notice, USACE Permit, <br />Pre -Construction Submittals, and coordination and meetings). It is assumed within this scope that <br />meetings held outside of the Pre -Bid meeting, Pre -Construction meeting (with the Contractor), and Pre - <br />SRC Sector 3 — 2018006 — WO#7: Pre -Construction Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.