Laserfiche WebLink
',>A P T I M April 3, 2020 <br />,Page 5 of 5 <br />Task 6: Cost <br />The lump sum cost for this task is $4,530. <br />Summary <br />The total lump sum cost to perform the proposed work described herein for Sector 3 — 2018006 — Work <br />Order #7 is $41,633.00. Please refer to Exhibit A, attached to the end of this proposal, for a summary of <br />the costs and labor hours of each Task. APTIM will proceed with the tasks upon receipt of a signed work <br />order from Indian River County (unless stated otherwise in the schedule). It is noted that some aspects <br />of this Work Order are dependent upon agency review and are outside the control of APTIM and the <br />County. As such, the scope, schedule and cost described herein is provided as a guideline. APTIM will <br />strive to execute each phase of the work within budget and in as expeditious a manner as possible. We <br />will coordinate with the County if deviations from the scope, schedule or budget arise due to unforeseen <br />issues or circumstances. <br />Thank you for the opportunity to serve Indian River County. We look forward to continuing to provide <br />expert professional services to the County. Please do not hesitate to call if you have any questions. <br />Sincerely, <br />Christopher Paul, P.E. <br />Project Manager I Coastal Engineer <br />Aptim Environmental & Infrastructure, LLC. <br />cc: Beau Suthard, PG, APTIM <br />Eric Charest (IRC) <br />Quintin Bergman (IRC) <br />Thomas Pierro, P.E., D.CE, CPE <br />Stacy Buck, CPE <br />IRC Sector 3 — 2018006 — WO#7: Pre -Construction Services <br />Corporate Signature <br />Beau C. Suthard, PG <br />Printed Name <br />Program Director <br />Title <br />