My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-103
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:07:52 AM
Creation date
5/21/2020 11:54:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/19/2020
Control Number
2020-103
Agenda Item Number
8.H.
Entity Name
XGD Systems, Inc.
Subject
Jones Pier Wetland Restoration and Conservation
Improvements
Area
7770 Jungle Trail Vero, Beach, FL
Bid Number
2020017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XGD SYSTEMS INC. CHANGE ORDER 1, CHANGE ORDER 2 + CONTINGENCY <br />AGREEMENT BID NUMBER 2020017 <br />JONES PIER WETLAND RESTORATION AND CONSERVATION IMPROVEMENTS <br />7770 JUNGLE TRAIL, VERO BEACH, FL 32960 <br />No. g (Page 1 of 2) <br />DATE OF ISSUANCE: 5/19/20 EFFECTIVE DATE:5/19/20 <br />OWNER: Indian River County CONTRACTORXGD SYSTEMS, INC. <br />Project:Jones Pier Wetland Restoration Project OWNER'S Bid No. 2020017 <br />You are directed to make the following changes in the Contract Documents: <br />1. The following Bid Items have been added to the Contract to account for modifications necessary during project <br />construction: <br />Change Order 1 <br />18A <br />Construct Restroom / Pavilion - Add one light fixture to each of the 2 <br />$1,945.00 <br />LS 1 <br />$1,945.00 <br />restrooms and add the add'I. cost due to the building slab change. <br />49A <br />Engineer Construction Coord. / Asbuilts / Certifications - Add the costs of <br />$3,500.00 <br />LS 1 <br />$3,500.00 <br />passing compaction testing. <br />52A <br />Excavation of wetland creation area and north outfall ditch - Additional <br />$1,061.50 <br />LS 1 <br />$1,061.50 <br />ditch work east of 53" x 34" ERCP Culvert. <br />53A <br />Construct 4' Bottom Width, 2:1 Slopes 3' Depth Influent Ditch Along S <br />$9,079.33 <br />LS 1 <br />$9,079.33 <br />Property Line -Add revetment along north side of south ditch bank. <br />Construct 1.5' Above Grade Walking Trail - Add the shifting & <br />56A <br />reconstructing the North Path adjacent to ponds approx. V to the south in <br />$9,659.90 <br />LS 1 <br />$9,659.90 <br />order to provide room to reconstruct & deepen the ditch. <br />Furnish & install 45"x29" RCP Culvert /w Inlet Protection - lower invert by <br />58A <br />4" and add 4" depth of bedding stone under culvert; add Rip -Rap at west <br />$4,506.34 <br />LS 1 <br />$4,506.34 <br />end (rip -rap provided by county). <br />Furnish & install 60"x36" RCP Box Culvert /w Inlet Protection & Stop Logs - <br />60A <br />change to 53" x 34" ERCP Culvert, add 4" depth of bedding stone under <br />$0.00 <br />LS 1 <br />$0.00 <br />culvert; add Rip -Rap at west end (rip -rap provided by county). <br />67A & Furnish & install 4' High Split Rail Fence (1180 LF @ $13.15/LF) and 4' High <br />68aA Black Vinyl Chain Link Fence (Option A) (830 LF @ $18.57/LF) - delete both ($2,469.94) LS 1 ($2,469.94) <br />items from contract and add new fencing from Adron Fence to contract <br />(note entrance and maintenance gates will be handled in a future CO). <br />69A Furnish & install Boardwalks - add 5 bulkheads. $2,502.00 LS 1 $2,502.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.