Laserfiche WebLink
Seed & Mulch (Seed Purchased By Owner) - Add the purchase of <br />73A Bahiagrass/Millet blend seed and add hydroseeding to stabilize pond $6,894.34 LS 1 $6,894.34 <br />banks. <br />New item Additional bond cost associated with CO#1 net increase. $293.43 LS 1 $293.43 <br />Change Order 001 Subtotal $36,971.90 <br />Change Order 2 <br />New <br />#80 <br />FPL Directional Bore 2" (service line to pavilion) <br />$30.80 <br />LF <br />205 <br />$6,314.00 <br />#81 <br />FPL Directional Bore 2" (installation only - FPL to provide material) <br />$27.50 <br />LF <br />220 <br />$6,050.00 <br />#82 <br />AT&T Directional Bore 2" (primary) <br />$30.80 <br />LF <br />220 <br />$6,776.00 <br />#83 <br />AT&T Directional Bore 1.5" (service to house) <br />$30.80 <br />LF <br />135 <br />$4,158.00 <br />#84 <br />COMCAST Directional Bore 2" (service to house) <br />$30.80 <br />LF <br />135 <br />$4,158.00 <br />#85 <br />Site Electric Directional Bore 1.25" (pavilion to garage / pavilion to <br />house) <br />$28.60 <br />LF <br />135 <br />$3,861.00 <br />#86 <br />Site Electric Directional Bore 1" (house to start of dock) <br />$28.60 <br />LF <br />145 <br />$4,147.00 <br />#87 <br />Site Electric Directional Bore 2" (screw pump to pavilion) <br />$30.80 <br />LF <br />290 <br />$8,932.00 <br />#88 <br />Site Electric - Electrician pulling CU conductors between FPL <br />hand hole to pavilion, pavilion to south building and pavilion to staff house <br />$15,262.50 <br />LS <br />1 <br />$15,262.50 <br />#gg <br />Additional bond cost associated with CO#2 increase <br />$477.27 <br />LS <br />1 <br />$477.27 <br />Change Order 002 Subtotal <br />$60,135.77 <br />10% Contingency $42,287.50 <br />The total Contract cost has increased $139,395.17 from $1,393,951.68 to <br />$1,533,346.85 as a result of Change Order No. 1, Change Order 2 and the additional contingency difference <br />added. <br />