My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-103
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:07:52 AM
Creation date
5/21/2020 11:54:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/19/2020
Control Number
2020-103
Agenda Item Number
8.H.
Entity Name
XGD Systems, Inc.
Subject
Jones Pier Wetland Restoration and Conservation
Improvements
Area
7770 Jungle Trail Vero, Beach, FL
Bid Number
2020017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Electric <br />• 135 LF directional bore 1.25 -inch conduit from pavilion to garage and from pavilion to <br />house. <br />• 145 LF directional bore 1 -inch conduit from house to start of dock. <br />o 290 LF directional bore 2 -inch from screw pump to pavilion. <br />• Services for an electrician to pull CU conductors between FPL handhole to pavilion, <br />pavilion to house, and pavilion to garage. <br />I have reviewed the fees associated with the change orders and recommend payment. Should you <br />have any questions, please do not hesitate to contact me at our office. <br />Sincerely, <br />C�RTER ASSOCIATES, INC. <br />1� <br />JoH. Blum, P.E. <br />rincipal <br />PA18-39 Jones PieAConstructionlCorrespondencelCOPr-2 Narra0ve.docn Page 3 of 3 CL 1� Since I4)I l <br />
The URL can be used to link to this page
Your browser does not support the video tag.