My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-103
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:07:52 AM
Creation date
5/21/2020 11:54:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/19/2020
Control Number
2020-103
Agenda Item Number
8.H.
Entity Name
XGD Systems, Inc.
Subject
Jones Pier Wetland Restoration and Conservation
Improvements
Area
7770 Jungle Trail Vero, Beach, FL
Bid Number
2020017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 2 <br />XGD SYSTEMS LLC <br />415 NW Flagler Ave., Unit 302, Stuart, FL 34994 <br />Tel: 772-286-3419 Fax: 772-286-2855 <br />www.xgd.systems <br />Jones Pier Wetland Restoration Project <br />Contractor: XGD Systems, LLC <br />C.O.#1 and C.O.#2 <br />Date: May 6, 2020 <br />Item <br />Description <br />Contract <br />Unit Price Unit Quantity Amount <br />Base Bid <br />18 <br />Construct Restroom / Pavilion <br />$132,000.00 <br />LS <br />1 <br />$132,000.00 <br />49 <br />Engineer Construction Coord. / Asbuilts / Certifications <br />$9,185.00 <br />LS <br />1 <br />$9,185.00 <br />52 <br />Excavation of wetland creation area and north outfall ditch <br />$3.82 <br />CY <br />24,950 <br />$95,309.00 <br />53 <br />Construct 4' Bottom Width, 2:1 Slopes 3' Depth Influent Ditch Along S <br />$9,30 <br />CY <br />510 <br />$4,743.00 <br />Property Line <br />56 <br />Construct 1.5' Above Grade Walking Trail <br />$0.94 <br />CY <br />4,450 <br />$4,183.00 <br />58 <br />Furnish & install 45"x29" RCP Culvert /w Inlet Protection <br />$249.10 <br />LF <br />68 <br />$16,938.80 <br />60 <br />Furnish & install 60"x36" RCP Box Culvert /w Inlet Protection & Stop Logs <br />$393.03 <br />LF <br />64 <br />$25,153.92 <br />67 & 68a <br />Furnish & install 4' High Split Rail Fence (1180 LF @ $13.15/LF) and 4' High <br />$30,930.10 <br />LS <br />1 <br />$30,930.10 <br />Black Vinyl Chain Link Fence (Option A) (830 LF @ $18.57/LF). <br />69 <br />Furnish & install Boardwalks <br />$203,170.00 <br />LS <br />1 <br />$203,170.00 <br />73 <br />Seed & Mulch (Seed Purchased By Owner) <br />$2,874.96 <br />Acre <br />6 <br />$17,249.76 <br />Base Bid Subtotal $538,862.58 <br />Change Order 001 <br />18A <br />Construct Restroom / Pavilion - Add one light fixture to each of the 2 <br />$1,945.00 <br />LS <br />1 <br />$1,945.00 <br />restrooms and add the add'I. cost due to the building slab change. <br />49A <br />Engineer Construction Coord. / Asbuilts / Certifications - Add the costs of <br />$3,500.00 <br />LS <br />i <br />$3,500.00 <br />passing compaction testing. <br />52A <br />Excavation of wetland creation area and north outfall ditch - Additional <br />$1,061.50 <br />LS <br />1 <br />$1,061.50 <br />ditch work east of 53" x 34' ERCP Culvert. <br />53A <br />Construct 4' Bottom Width, 2:1 Slopes 3' Depth Influent Ditch Along S <br />$9,079.33 <br />LS <br />1 <br />$9,079.33 <br />Property Line - Add revetment along north side of south ditch bank. <br />Construct 1.5' Above Grade Walking Trail - Add the shifting & <br />56A <br />reconstructing the North Path adjacent to ponds approx. 6' to the south in <br />$9,659.90 <br />LS <br />1 <br />$9,659.90 <br />order to provide room to reconstruct & deepen the ditch. <br />Furnish & install 45"x29" RCP Culvert /w Inlet Protection - lower invert by <br />58A <br />4" and add 4" depth of bedding stone under culvert; add Rip -Rap at west <br />$4,506.34 <br />LS <br />1 <br />$4,506.34 <br />end (rip -rap provided by county). <br />Furnish & install 60"06" RCP Box Culvert /w Inlet Protection & Stop Logs - <br />60A <br />change to 53" x 34" ERCP Culvert, add 4" depth of bedding stone under <br />$0.00 <br />LS <br />1 <br />$0.00 <br />culvert; add Rip -Rap at west end (rip -rap provided by county). <br />' XGD /*,,TDi! /�,,ECOBLUE <br />'GOLF:; )SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.