My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-103
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-103
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:07:52 AM
Creation date
5/21/2020 11:54:23 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
05/19/2020
Control Number
2020-103
Agenda Item Number
8.H.
Entity Name
XGD Systems, Inc.
Subject
Jones Pier Wetland Restoration and Conservation
Improvements
Area
7770 Jungle Trail Vero, Beach, FL
Bid Number
2020017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
XGD SYSTEMS LLC <br />415 NW Flagler Ave., Unit 302, Stuart, FL 34994 <br />Tel: 772-286-3419 Fax: 772-286-2855 <br />www.xgd.systems <br />XGD °TDI ,ECOBLUE <br />GOLF:SYSTEMS <br />Furnish & install 4' High Split Rail Fence (1180 LF @ $13.15/LF) and 4' High <br />67A & 68aA <br />Black Vinyl Chain Link Fence (Option A) (830 LF @ $18.57/LF) - delete both <br />($2,469.94) <br />LS <br />1 <br />($2,469.94) <br />items from contract and add new fencing from Adron Fence to contract <br />(note entrance and maintenance gates will be handled in a future CO). <br />69A <br />Furnish & install Boardwalks - add 5 bulkheads. <br />$2,502.00 <br />LS <br />1 <br />$2,502.00 <br />Seed & Mulch (Seed Purchased By Owner) - Add the purchase of <br />73A <br />Bahiagrass/Millet blend seed and add hydroseeding to stabilize pond <br />$6,894.34 <br />LS <br />1 <br />$6,894.34 <br />banks. <br />New Item <br />Additional bond cost associated with C0#1 net increase. <br />$293.43 <br />LS <br />1 <br />$293.43 <br />Change Order 001 Subtotal $36,971.90 <br />Change Order 002 <br />New Item <br />Phase 1 <br />FPL Directional Bore 2" (service line to pavilion) <br />$30.80 <br />LF <br />205 <br />$6,314.00 <br />Utilities <br />New Item <br />FPL Directional Bore 2" (installation only - FPL to provide <br />Phase 1 <br />material) <br />$27,50 <br />LF <br />220 <br />$6,050.00 <br />utilities <br />New Item <br />Phase 1 <br />AT&T Directional Bore 2" (primary) <br />$30.80 <br />LF <br />220 <br />$6,776.00 <br />Utilities <br />New Item <br />Phase 1 <br />AT&T Directional Bore 1.5" (service to house) <br />$30.80 <br />LF <br />135 <br />$4,158.00 <br />Utilities <br />New Item <br />Phase 1 <br />COMCAST Directional Bore 2" (service to house) <br />$30.80 <br />LF <br />135 <br />$4,158.00 <br />Utilities <br />New Item <br />l <br />Site Electric Directional Bore 1.25" (pavilion to garagePhase / <br />$28.60 <br />LF <br />135 <br />$3,861.00 <br />Utilities <br />pavilion to house) <br />New Item <br />Phase 1 <br />Site Electric Directional Bore 1" (house to start of dock) <br />$28.60 <br />LF <br />145 <br />$4,147.00 <br />Utilities <br />New Item <br />Phase 1 <br />Site Electric Directional Bore 2" (screw pump to pavilion) <br />$30.80 <br />LF <br />290 <br />$8,932.00 <br />Utilities <br />New Item <br />Site Electric - Electrician pulling CU conductors between FPL <br />Phase 1 <br />hand hole to pavilion, pavilion to south building and pavilion <br />$15,262.50 <br />LS <br />1 <br />$15,262.50 <br />Utilities <br />to staff house <br />New Item <br />Phase 1 <br />Additional bond cost associated with CO#2 increase <br />$477.27 <br />LS <br />1 <br />$477.27 <br />Utilities <br />Change Order 002 Subtotal $60,135.77 <br />Total $635,970.25 <br />XGD °TDI ,ECOBLUE <br />GOLF:SYSTEMS <br />
The URL can be used to link to this page
Your browser does not support the video tag.