My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/07/2020
CBCC
>
Meetings
>
2020's
>
2020
>
04/07/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:37:24 PM
Creation date
6/1/2020 12:14:35 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
04/07/2020
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Structural Engineering — Preparation of Construction Documents to include the following: <br />• Coordination with Donadio & Associates, Architects, P.A. <br />• Design and prepare the Structural Documents for permit submittal and construction to include Foundation <br />Plans, Floor Plans, Roof Framing Plan, Sections, Details, Schedules and Specifications in short format on <br />the plans. <br />• Preparation of Schematic, Design Development, Construction Documents and Permit Revision <br />Documents. <br />• Preparation of all documents for building permits submittal. <br />• Responses to building permit review comments. <br />• Attendance at Pre-Construction/Design Meetings. <br />• Complete Construction Administration Services shall be included In addition provide scheduled <br />site observations, review of Contractor's requests for information and/or clarifications, shop <br />drawing reviews, review of change order and decisions on any claims or disputes, punch -list <br />walk-thru with contractor and County to determine general conformity with approved plans and <br />specifications. <br />Mechanical/Electrical/ Engineering — Preparation of Construction Documents to include the following: <br />• Coordination with Donadio & Associates, Architects, P.A. <br />• Design criteria for heating, ventilation and air conditioning (HVAC), electrical and plumbing <br />• Construction documents and specifications for HVAC, electrical and plumbing, which include but <br />are not limited to: floor plans, schedules, electrical and plumbing risers, electrical panels, reflected <br />ceiling plans and details, along with Fire Sprinkler System Performance Specification. <br />• Preparation of Schematic, Design Development, Construction Documents and Permit Revision <br />Documents. <br />• Florida Energy Calculations. <br />• Preparations of all documents for building permit submittal. <br />• Responses to building permit review comments. <br />• Attendance at Pre-Construction/Design Meetings. <br />• Complete Construction Administration Services shall be included In addition provide scheduled <br />site observations, review of Contractor's requests for information and/or clarifications, shop <br />drawing reviews, review of change order and decisions on any claims or disputes, punch -list <br />walk-thru with contractor and County to determine general conformity with approved plans and <br />specifications. <br />Civil Engineering — Preparation of Construction Documents to include the following: <br />• Coordination with Donadio & Associates, Architects, P.A. <br />• Project coordination with the following regulatory agencies: <br />o City of Sebastian (COS) <br />o Indian River County (IRC) <br />o St. John's River Water Management District (SJRWMD) <br />• Project coordination and review of the required boundary, project specific topographic and tree survey as <br />provided by the County. It is also understood that the necessary hard copies (signed . and sealed) will <br />be provided by the County as needed to support the permit agencies application submissions. <br />• Coordination with project Architect for Base plan coordination on project building area and addition. <br />100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.