Laserfiche WebLink
Contract Drawings (for Segment 3 Cell 1): <br />Sheet No. <br />Title <br />General <br />G-0 <br />Cover (Including Location Map) <br />G-1 <br />General Notes/Symbols/Legend/Index of Sheets <br />G-2 <br />Existing Conditions/Limits of Construction/Horizontal Control Plan <br />Civil <br />C-1 <br />Landfill Gas System Plan <br />C-2 <br />Compressed Air and Condensate Force Main Plan <br />CD -1 <br />Landfill Gas System Details I <br />CD -2 <br />Landfill Gas System Details II <br />CD -3 <br />Landfill Gas System Details III <br />CD -4 <br />Landfill Gas System Details IV (if required) <br />Subtask 3.2 - Specifications <br />CONSULTANT will prepare specifications, utilizing the EJCDC/CSI format (50 -Division), which will consist <br />of written technical descriptions of materials, equipment, construction systems, standards and <br />workmanship as applied to this project. Specifications for construction will include the LFG system <br />components, and other applicable items. CONSULTANT will include incorporating the construction <br />permit conditions, if any, into the specifications prior to award of contract. <br />Subtask 3.3 - Front -End Documents <br />SWDD will supply the Front -End Documents and CONSULTANT will edit them to provide the project <br />specific information needed to bid the project. CONSULTANT will work with SWDD to develop owner <br />direct purchase language to be included in the front-end documents, if necessary. <br />Subtask 3.4 - Opinion of Probable Construction Cost (OPCC) <br />CONSULTANT will prepare an OPCC at the 100 percent completion stage and submit the estimate to <br />SWDD for review. The estimate will be based on generally accepted costs for this type of work. <br />Deliverables: <br />■ 60 and 100 percent drawings (electronic PDF and AutoCAD format, including associated x -refs) <br />and technical specifications (electronic PDF). <br />■ Final Contract Documents Package (two signed and sealed hard copies and electronic PDFs of the <br />drawings and technical specifications). <br />■ Opinion of probable construction cost at 100 percent design (electronic PDF). <br />TASK 4.0 - PERMITTING ASSISTANCE <br />CONSULTANT will prepare and submit a minor modification to Construction/Operation Permit Nos: <br />0128769 -022 -SC and 0128769 -023 -SO to include the proposed Segment 3 Cell 2 horizontal gas collectors <br />into the design and permit. <br />Activities performed under this task consist of those functions required to prepare the application for a <br />CDM <br />Smith A-4 jj2756 Exhibit A.doa <br />