My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-105A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-105A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:52:34 AM
Creation date
6/10/2020 9:36:45 AM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
minor modification to the Construction/Operation Permit (Permit Nos: 0128769 -022 -SC and 0128769- <br />023 -SO), participate in a pre -application meeting with FDEP, and respond to one of FDEP's requests for <br />additional information (RAI). Also included are preparation of the notifications required by the <br />operations permit. <br />Task 4.0 includes the specific activities identified below: <br />Subtask 4.1- Pre -Application Meeting <br />CONSULTANT will attend one pre -application meeting with FDEP staff via a teleconference. The purpose <br />of the meeting will be to communicate with FDEP regarding the proposed contents of the permit <br />application submittal package. <br />Subtask 4.2 - Permit Application <br />CONSULTANT will prepare and submit to FDEP the application for a minor modification to the <br />Construction/Operation Permit required by Chapter 62-701.320, F.A.0 to include the horizontal gas <br />collectors in Segment 3 Cell 2 into the design and permit. <br />Subtask 4.3 - RAls <br />CONSULTANT will respond to one RAI from FDEP. <br />Subtask 4.4 - Construction Notification <br />CONSULTANT will prepare and submit a courtesy notification to the FDEP prior to construction of <br />the landfill gas system expansion in Segment 3 Cell 1. <br />Deliverables: <br />■ Segment 3 Cell 2 LFG Gas system permit modification application <br />■ Design drawings to support permit modification. <br />TASK 5.0 - BIDDING ASSISTANCE <br />In this task, CONSULTANT will assist SWDD in obtaining bids for the construction of the project, assist <br />SWDD in evaluating the bids and in assembling and awarding the contract, and will arrange and preside <br />over a pre-bid conference. <br />Task 5.0 includes the specific activities identified below: <br />Subtask 5.1 - <br />CONSULTANT will provide a Contract Documents Package in electronic PDF format suitable for <br />distribution to bidders, coordinate the advertisement of the bid, respond to communications from <br />Contractors, attend a pre-bid conference, and assist with the issuance of up to two addenda. SWDD <br />will advertise for bids and distribute documents to the plan holders. <br />Subtask 5.2 - <br />CONSULTANT will attend one bid opening, evaluate bids, and recommend a bidder for award of contract <br />to SWDD. The bidding phase of the project terminates when an assumed Notice of Award is issued to a <br />Contractor. <br />TASK 6.0 - ADDITIONAL ENGINEERING SERVICES <br />smith A-5 J12756_Exhibit A.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.