My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-106A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-106A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:56:44 AM
Creation date
6/12/2020 9:58:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/19/2020
Control Number
2020-106A
Agenda Item Number
signed by admin
Entity Name
MBV Engineering, Inc.
Jones Pier
Subject
Jones’ Pier, Amendment #3 to Work Order #5 electrical construction services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OT-UTIL UTILITY PIANS <br />$ - <br />Preliminary Sanitary Layout <br />$ _ <br />Preliminary Water Layout <br />$ _ <br />Finalize Water Plans <br />$ _ <br />Finalize Sewer Plans <br />$ - <br />Sanitary Profiles <br />$ - <br />Conflict Details <br />$ <br />Fire Plans <br />$ <br />Reuse Plans <br />$ <br />Gas/ Electric <br />$ <br />Details <br />$ <br />Lift Station Calculations <br />$ <br />Water Design Engineering <br />$ <br />Revisions per Agency Comments <br />$ <br />Progress meetings <br />$ <br />$ <br />Sub -Consultant Coord <br />Permit Packages <br />Municipal Coordination 1.5 <br />Agency Responses <br />1.5 $ 135.00 <br />Municipal Coordination <br />$ - <br />08-LNDSCP LANDSCAPE PLANS <br />MISCELLANEOUS/ OFF -SDE PIANS <br />Landscape Plan layout <br />$ <br />Landscape Calculations/ Table <br />$ - <br />LandscapeDetails/Specs <br />$ <br />Revisions per Agency Comments <br />$ <br />Progress meetings <br />$ <br />Off -Site Force Main <br />$ <br />Sub -Consultant Coord <br />Permit Packages <br />Municipal Coordination 1.5 <br />Agency Responses <br />1.5 $ 135.00 <br />Municipal Coordination <br />$ - <br />09-MISCOFF <br />MISCELLANEOUS/ OFF -SDE PIANS <br />Coordination/ Meetings <br />$ <br />Turn lane Plans <br />$ <br />Off-site Roadway Plans <br />$ <br />Forcemain Extension Plans <br />$ <br />Watermain Plans <br />$ <br />Off -Site Force Main <br />$ <br />MOT Plans <br />$ <br />Revisions per Agency Comments <br />$ <br />Progress meetings <br />$ <br />$ <br />Sub -Consultant Coord <br />Permit Packages <br />Municipal Coordination 1.5 <br />Agency Responses <br />1.5 $ 135.00 <br />Municipal Coordination <br />$ - <br />Team Meetings <br />$ - <br />OpinionoiProbableCost <br />$ - <br />Schedules <br />$ - <br />QCOtPlanS <br />$ - <br />SUMMARY <br />DEVELOPMENT HOURS AND COSTS <br />ADMIN INSPECTOR TECH ENG PM TOTAL COSTS <br />Total 2.5 Hr 2.5 Hr $ 225.00 <br />Contingency= 20% <br />$ 281.25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.