My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020-106A
CBCC
>
Official Documents
>
2020's
>
2020
>
2020-106A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2021 11:56:44 AM
Creation date
6/12/2020 9:58:01 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
05/19/2020
Control Number
2020-106A
Agenda Item Number
signed by admin
Entity Name
MBV Engineering, Inc.
Jones Pier
Subject
Jones’ Pier, Amendment #3 to Work Order #5 electrical construction services
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
View images
View plain text
Shop Drawings <br />Inspections <br />Site Visit <br />Contractor / owner coord <br />Site Changes <br />Final Certifications <br />Miscellaneous <br />TECH ENG PM TOTAL <br />SUMMARY <br />(WITH CONSTRUCTION) <br />ADMIN INSPECTOR TECH ENG PM TOTAL COSTS <br />Total 2.5 Hr 2.5 Hr 1 $ 225.00 <br />Contingency= <br />$ 225.00 <br />Comparative numbers <br />Estimated construction cost: (construction costs of discipline) <br />%design fees (ASCE comp curve) <br />Calculated Design fee $ - <br />Rev Date: 202001-30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).